College of Sciences staff by location (campus)

Prof Suzanne Wilkinson staff profile picture

Contact details +6492136923

Prof Suzanne Wilkinson

Associate Dean Research

Doctoral Mentor Supervisor
College of Sciences

Professor of Construction Management

School of Built Environment

I am Professor of Construction Management in the New School for Built Environment, Massey University, Auckland.

I have a PhD in Construction Management, and a BEng (Hons) in Civil Engineering, both from Oxford Brookes University, UK.

I have a Graduate Diploma in Business Studies (Dispute Resolution) from Massey University.

My research focuses on disaster management, construction innovation, resilience and smart cities. 

I am interested in how cities, communities and organisations, including construction organisations, plan for disasters and manage hazard events and how to make them more resilience.

At the moment I am working on ideas on construction climate mitigation.

Research Expertise

Research Interests

Resilience

disaster reconstruction

disaster management

climate change

climate adaptation

disaster recovery

Construction industry productivity

construction industry procurement

construction law

Research Opportunities

  • Disaster Management  (01/04/2020) Develop research expertise in disaster management, mitigation and recovery
  • Resilience  (01/04/2020) Understand how resilience is managed at city, community and organisational level
  • Construction Innovation  (01/04/2020) develop research expertise in construction innovation, including how companies adopt innovation practices
  • Climate Change in the Built Environment  (01/04/2020) Understand how climate impacts buildings and the construction sector

Thematics

21st Century Citizenship, Resource Development and Management, Health and Well-being

Area of Expertise

Field of research codes
Building (120200): Building Construction Management and Project Planning (120201): Built Environment And Design (120000): Community Planning (120501): Design Practice and Management (120300):
Earth Sciences (040000):
Environmental Sciences (050000):
Land Use and Environmental Planning (120504): Other Built Environment and Design (129900):
Technology (100000):
Urban and Regional Planning (120500)

Keywords

Resilience

disaster reconstruction

disaster management

climate change

climate adaptation

disaster recovery

Construction industry productivity

construction industry procurement

construction law

Research Projects

Summary of Research Projects

Position Current Completed
Key Researcher / Named Investigator / Associate Investigator 1 0
Project Leader 1 6
Team Member 1 1

Completed Projects

Project Title: Building Capability to help the Construction Industry Transition to Zero Carbon

The global climate has already changed as a result of greenhouse gas emissions from human activities. Although there is uncertainty about the exact speed and level of change, careful future planning is essential to mitigate projected effects and minimise future emissions. This research programme has embarked on a training and development programme for upskilling industry that supports the next generation of building professionals with training, knowledge, and skills on reducing greenhouse gas emissions and mitigating the effects of climate change.
Read Project Description Hide Project Description

Date Range: 2021 - 2022

Funding Body: BRANZ Ltd

Project Team:

Research Outputs

Journal

Khatibi, H., Wilkinson, S., Sweya, LN., Baghersad, M., & Dianat, H. (2024). Navigating Climate Change Challenges through Smart Resilient Cities: A Comprehensive Assessment Framework. Land. 13(3)
[Journal article]Authored by: Wilkinson, S.
Asadi, R., Wilkinson, S., & Rotimi, JOB. (2023). Mixed-Method Approach to Evaluate Rework Provisions within New Zealand Construction Contracts. Construction Economics and Building. 23(3-4), 45-70
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Bui, TTP., Wilkinson, S., MacGregor, C., & Domingo, N. (2023). Decision making in reducing carbon emissions for building refurbishment: Case studies of university buildings in New Zealand. Building and Environment. 242
[Journal article]Authored by: Domingo, N., Wilkinson, S.
Fathianpour, A., Wilkinson, S., Babaeian Jelodar, M., & Evans, B. (2023). Reducing the vulnerability of tourists to tsunami: challenges for decision-makers. Natural Hazards. 118(2), 1315-1339
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Bui, TTP., MacGregor, C., Domingo, N., & Wilkinson, S. (2023). Collaboration and integration towards zero carbon refurbishment: A New Zealand case study. Energy for Sustainable Development. 74, 361-371
[Journal article]Authored by: Domingo, N., Wilkinson, S.
Fathianpour, A., Babaeian Jelodar, M., Wilkinson, S., & Evans, B. (2023). Resilient evacuation infrastructure; an assessment of resilience toward natural hazards. International Journal of Disaster Resilience in the Built Environment. 14(4), 536-552
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Asadi, R., Rotimi, JOB., & Wilkinson, S. (2023). Analyzing Underlying Factors of Rework in Generating Contractual Claims in Construction Projects. Journal of Construction Engineering and Management. 149(6)
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Nidhin, BKSN., Domingo, N., Bui, TTP., & Wilkinson, S. (2023). Construction stakeholders' knowledge on zero carbon initiatives in New Zealand. International Journal of Building Pathology and Adaptation.
[Journal article]Authored by: Domingo, N., Wilkinson, S.
Elkhidir, E., Mannakkara, S., Henning, TFP., & Wilkinson, S. (2023). A pathway towards resilient cities: National resilience knowledge networks. Cities. 136
[Journal article]Authored by: Elkhidir, E., Wilkinson, S.
Fathianpour, A., Evans, B., Jelodar, MB., & Wilkinson, S. (2023). Tsunami evacuation modelling via micro-simulation model. Progress in Disaster Science. 17
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Asadi, R., Rotimi, JOB., & Wilkinson, S. (2023). Rework causes classification model with liable parties of the contract in construction projects. Frontiers in Built Environment. 9
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Bui, TTP., MacGregor, C., Wilkinson, S., & Domingo, N. (2023). Towards zero carbon buildings: issues and challenges in the New Zealand construction sector. International Journal of Construction Management. 23(15), 2709-2716
[Journal article]Authored by: Domingo, N., Wilkinson, S.
Asadi, R., Wilkinson, S., & Rotimi, JOB. (2023). Guidelines for Mapping Rework in the Contract Conditions of Construction Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 15(1)
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Asadi, R., Wilkinson, S., & Rotimi, JOB. (2023). The common causes of rework in construction contracts: a diagnostic approach. Journal of Engineering, Design and Technology. 21(4), 1107-1133
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Radman, K., Jelodar, MB., Lovreglio, R., Ghazizadeh, E., & Wilkinson, S. (2022). Digital technologies and data-driven delay management process for construction projects. Frontiers in Built Environment. 8
[Journal article]Authored by: Babaeianjelodar, M., Lovreglio, R., Wilkinson, S.
Auliagisni, W., Wilkinson, S., & Elkharboutly, M. (2022). Learning from Floods—How a Community Develops Future Resilience. Water (Switzerland). 14(20)
[Journal article]Authored by: Elkharboutly, M., Wilkinson, S.
He, P., Bui, TTP., Shahzad, W., Wilkinson, S., & Domingo, N. (2022). Towards Effective Implementation of Carbon Reduction Strategies in Construction Procurement: A Case Study of New Zealand. Buildings. 12(10)
[Journal article]Authored by: Domingo, N., Shahzad, W., Wilkinson, S.
Elkharboutly, M., & Wilkinson, S. (2022). Cyclone resistant housing in Fiji: The forgotten features of traditional housing. International Journal of Disaster Risk Reduction. 82
[Journal article]Authored by: Elkharboutly, M., Wilkinson, S.
Khatibi, H., Wilkinson, S., Eriwata, G., Sweya, LN., Baghersad, M., Dianat, H., . . . Javanmardi, A. (2022). An integrated framework for assessment of smart city resilience. Environment and Planning B: Urban Analytics and City Science. 49(5), 1556-1577
[Journal article]Authored by: Wilkinson, S.
Auliagisni, W., Wilkinson, S., & Elkharboutly, M. (2022). Using community-based flood maps to explain flood hazards in Northland, New Zealand. Progress in Disaster Science. 14
[Journal article]Authored by: Elkharboutly, M., Wilkinson, S.
Nwadike, AN., & Wilkinson, S. (2022). Unintended Consequences of Performance-Based Building Code Amendment in New Zealand. Journal of Performance of Constructed Facilities. 36(3)
[Journal article]Authored by: Wilkinson, S.
Babaeian Jelodar, M., Yiu, TW., & Wilkinson, S. (2022). Empirical Modeling for Conflict Causes and Contractual Relationships in Construction Projects. Journal of Construction Engineering and Management. 148(5)
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Ghodrati, N., Yiu, TW., Wilkinson, S., Poshdar, M., Talebi, S., Elghaish, F., . . . Sepasgozar, SME. (2022). Unintended Consequences of Productivity Improvement Strategies on Safety Behaviour of Construction Labourers; A Step toward the Integration of Safety and Productivity. Buildings. 12(3)
[Journal article]Authored by: Wilkinson, S.
Rad, MH., Mojtahedi, M., Ostwald, MJ., & Wilkinson, S. (2022). A Conceptual Framework for Implementing Lean Construction in Infrastructure Recovery Projects. Buildings. 12(3)
[Journal article]Authored by: Wilkinson, S.
Dianat, H., Wilkinson, S., Williams, P., & Khatibi, H. (2022). Choosing a holistic urban resilience assessment tool. International Journal of Disaster Risk Reduction. 71
[Journal article]Authored by: Wilkinson, S.
Elkhidir, E., Mannakkara, S., Henning, TFP., & Wilkinson, S. (2022). Knowledge types and knowledge transfer mechanisms for effective resilience knowledge-sharing between cities – A case study of New Zealand. International Journal of Disaster Risk Reduction. 70
[Journal article]Authored by: Elkhidir, E., Wilkinson, S.
Sweya, LN., & Wilkinson, S. (2022). Validation and pilot assessment of Tanzania water supply resilience measures. Journal of Applied Water Engineering and Research. 10(4), 311-321
[Journal article]Authored by: Wilkinson, S.
Asadi, R., Rotimi, JOB., & Wilkinson, S. (2022). Investigating the Relationship between Reworks and Contractual Claims: The Salience of Contract Conditions. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 14(1)
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Babaeian Jelodar, M., Wilkinson, S., Kalatehjari, R., & Zou, Y. (2022). Designing for construction procurement: an integrated Decision Support System for Building Information Modelling. Built Environment Project and Asset Management. 12(1), 111-127
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Nwadike, AN., & Wilkinson, S. (2022). An evidence-based framework validation for building code improvement in New Zealand. Engineering, Construction and Architectural Management. 29(8), 3072-3090
[Journal article]Authored by: Wilkinson, S.
Adafin, J., Wilkinson, S., Rotimi, JOB., MacGregor, C., Tookey, J., & Potangaroa, R. (2022). Creating a case for innovation acceleration in the New Zealand building industry. Construction Innovation. 22(1), 185-204
[Journal article]Authored by: Potangaroa, R., Rotimi, J., Wilkinson, S.
Khatibi, H., Wilkinson, S., Dianat, H., Baghersad, M., Ghaedi, K., & Javanmardi, A. (2022). Indicators bank for smart and resilient cities: design of excellence. Built Environment Project and Asset Management. 12(1), 5-19
[Journal article]Authored by: Wilkinson, S.
Nwadike, AN., & Wilkinson, S. (2022). Why amending building codes? An investigation of the benefits of regular building code amendment in New Zealand. International Journal of Building Pathology and Adaptation. 40(1), 76-100
[Journal article]Authored by: Wilkinson, S.
Baghersad, M., Wilkinson, S., & Khatibi, H. (2021). Comprehensive Indicator Bank for Resilience of Water Supply Systems. Advances in Civil Engineering. 2021
[Journal article]Authored by: Wilkinson, S.
Asadi, R., Wilkinson, S., & Rotimi, JOB. (2021). Towards contracting strategy usage for rework in construction projects: a comprehensive review. Construction Management and Economics. 39(12), 953-971
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Dianat, H., Wilkinson, S., Williams, P., & Khatibi, H. (2021). Planning the resilient city: Investigations into using “causal loop diagram” in combination with “UNISDR scorecard” for making cities more resilient. International Journal of Disaster Risk Reduction. 65
[Journal article]Authored by: Wilkinson, S.
Radman, K., Babaeian Jelodar, M., Ghazizadeh, E., & Wilkinson, S. (2021). Causes of Delay in Smart and Complex Construction Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 13(4)
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Sweya, LN., Wilkinson, S., & Kassenga, G. (2021). A social resilience measurement tool for Tanzania's water supply systems. International Journal of Disaster Risk Reduction. 65
[Journal article]Authored by: Wilkinson, S.
Bui, TTP., Wilkinson, S., Domingo, N., & MacGregor, C. (2021). Zero carbon building practices in aotearoa New Zealand. Energies. 14(15)
[Journal article]Authored by: Domingo, N., Wilkinson, S.
Nwadike, A., & Wilkinson, S. (2021). Promoting Performance-Based Building Code Compliance in New Zealand. Journal of Performance of Constructed Facilities. 35(4)
[Journal article]Authored by: Wilkinson, S.
Khatibi, H., Wilkinson, S., Baghersad, M., Dianat, H., Ramli, H., Suhatril, M., . . . Ghaedi, K. (2021). The resilient – smart city development: a literature review and novel frameworks exploration. Built Environment Project and Asset Management. 11(4), 493-510
[Journal article]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., Costello, SB., & Jang, H. (2021). Comparing Client Values between Business-as-Usual Construction and Postdisaster Reconstruction. Natural Hazards Review. 22(3)
[Journal article]Authored by: Wilkinson, S.
Rodrigo, N., & Wilkinson, S. (2021). Impact of flagship projects on the recovery of a city post-disaster. International Journal of Disaster Risk Reduction. 58
[Journal article]Authored by: Wilkinson, S.
Nwadike, AN., & Wilkinson, S. (2021). Building code amendment and building resilience: perspective of building code users in New Zealand. Built Environment Project and Asset Management. 11(4), 643-659
[Journal article]Authored by: Wilkinson, S.
Adafin, J., Rotimi, JOB., & Wilkinson, S. (2021). An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology. 19(1), 41-61
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Sweya, LN., & Wilkinson, S. (2021). Tool development to measure the resilience of water supply systems in Tanzania: Economic dimension. Jamba: Journal of Disaster Risk Studies. 13(1), 1-9
[Journal article]Authored by: Wilkinson, S.
Sweya, LN., Wilkinson, S., Kassenga, G., & Lugomela, G. (2021). Development of a Tool for Measuring Resilience of Water Supply Systems in Tanzania: Technical Dimension. Journal of Water Resources Planning and Management. 147(2)
[Journal article]Authored by: Wilkinson, S.
Elkhidir, E., Mannakkara, S., & Wilkinson, S. (2020). Criteria for selecting partner cities in a national-level resilience network. International Journal of Disaster Resilience in the Built Environment. 12(4), 443-454
[Journal article]Authored by: Elkhidir, E., Wilkinson, S.
Pu, G., Chang-Richards, A., Wilkinson, S., & Potangaroa, R. (2021). What makes a successful livelihood recovery? a study of China’s Lushan earthquake. Natural Hazards. 105(3), 2543-2567
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Neeraj, S., Mannakkara, S., & Wilkinson, S. (2021). Evaluating socio-economic recovery as part of building back better in Kaikoura, New Zealand. International Journal of Disaster Risk Reduction. 52
[Journal article]Authored by: Wilkinson, S.
Balaei, B., Noy, I., Wilkinson, S., & Potangaroa, R. (2021). Economic factors affecting water supply resilience to disasters. Socio-Economic Planning Sciences. 76
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Neeraj, S., Mannakkara, S., & Wilkinson, S. (2020). Build back better concepts for resilient recovery: a case study of India’s 2018 flood recovery. International Journal of Disaster Resilience in the Built Environment. 12(3), 280-294
[Journal article]Authored by: Wilkinson, S.
Shamout, S., Boarin, P., & Wilkinson, S. (2021). The shift from sustainability to resilience as a driver for policy change: a policy analysis for more resilient and sustainable cities in Jordan. Sustainable Production and Consumption. 25, 285-298
[Journal article]Authored by: Wilkinson, S.
Adafin, J., Rotimi, JOB., & Wilkinson, S. (2021). An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology. 19(1), 41-61 Retrieved from https://www.emerald.com/insight/content/doi/10.1108/JEDT-03-2019-0056/full/html
[Journal article]Authored by: Wilkinson, S.
Nwadike, A., & Wilkinson, S. (2022). Challenges facing building code compliance in New Zealand. International Journal of Construction Management. 22(13), 2493-2503
[Journal article]Authored by: Wilkinson, S.
Sweya, LN., Wilkinson, S., Mayunga, J., Joseph, A., Lugomela, G., & Victor, J. (2020). Development of a Tool to Measure Resilience against Floods for Water Supply Systems in Tanzania. Journal of Management in Engineering. 36(4), 1-12 Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000783
[Journal article]Authored by: Wilkinson, S.
Odiase, O., Wilkinson, S., & Neef, A. (2020). Risk of a disaster: Risk knowledge, interpretation and  resilience. Jamba: Journal of Disaster Risk Studies. 12(1), 1-9
[Journal article]Authored by: Wilkinson, S.
Ali, RA., Mannakkara, S., & Wilkinson, S. (2020). Factors affecting successful transition between post-disaster recovery phases: a case study of 2010 floods in Sindh, Pakistan. International Journal of Disaster Resilience in the Built Environment. 11(5), 597-614
[Journal article]Authored by: Wilkinson, S.
Sweya, LN., Wilkinson, S., Mayunga, J., Joseph, A., Lugomela, G., & Victor, J. (2020). Development of a Tool to Measure Resilience against Floods for Water Supply Systems in Tanzania. Journal of Management in Engineering. 36(4)
[Journal article]Authored by: Wilkinson, S.
Odiase, O., Wilkinson, S., & Neef, A. (2020). Disaster Risk and the Prospect of Enhancing the Resilience of the African Community in Auckland. Risk, Hazards and Crisis in Public Policy. 11(2), 188-203
[Journal article]Authored by: Wilkinson, S.
Balaei, B., Wilkinson, S., Potangaroa, R., & McFarlane, P. (2020). Investigating the technical dimension of water supply resilience to disasters. Sustainable Cities and Society. 56
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Sweya, LN., & Wilkinson, S. (2020). A tool for measuring environmental resilience to floods in Tanzania water supply systems. Ecological Indicators. 112
[Journal article]Authored by: Wilkinson, S.
Odiase, O., Wilkinson, S., & Neef, A. (2020). Risk of natural hazards and the coping capacity of the South African community in Auckland. International Journal of Disaster Resilience in the Built Environment. 11(3), 343-357
[Journal article]Authored by: Wilkinson, S.
Aryal, A., & Wilkinson, S. (2020). The role of social capital in the recovery of cultural built heritage: Evidence from three heritage sites in Nepal. International Journal of Disaster Resilience in the Built Environment. 11(1), 44-57
[Journal article]Authored by: Wilkinson, S.
Odiase, O., Wilkinson, S., & Neef, A. (2020). South African community in Auckland: Natural hazards and the resilience to a potential disaster event. Disaster Prevention and Management: An International Journal. 29(3), 390-404
[Journal article]Authored by: Wilkinson, S.
Odiase, O., Wilkinson, S., & Neef, A. (2020). Urbanisation and disaster risk: the resilience of the Nigerian community in Auckland to natural hazards. Environmental Hazards. 19(1), 90-106
[Journal article]Authored by: Wilkinson, S.
Azizi, NSM., Wilkinson, S., Din, MAM., & Salim, NAA. (2018). An analysis of occupants response to thermal discomfort in green and conventional buildings in Malaysia. Journal of Advanced Research in Fluid Mechanics and Thermal Sciences. 47(1), 159-171
[Journal article]Authored by: Wilkinson, S.
Aryal, A., & Wilkinson, S. (2019). The role of social capital in the recovery of cultural built heritage. International Journal of Disaster Resilience in the Built Environment.
[Journal article]Authored by: Wilkinson, S.
Chowdhury, T., Adafin, J., & Wilkinson, S. (2019). Review of digital technologies to improve productivity of New Zealand construction industry. Journal of Information Technology in Construction. 24, 569-587
[Journal article]Authored by: Wilkinson, S.
Sweya, LN., Wilkinson, S., Kassenga, G., & Mayunga, J. (2020). Developing a tool to measure the organizational resilience of Tanzania's water supply systems. Global Business and Organizational Excellence. 39(2), 6-19
[Journal article]Authored by: Wilkinson, S.
Fathianpour, A., Jelodar, MB., & Wilkinson, S. (2019). Developing Improvements to Multi-Hazard Risk Assessments. International Journal of Civil and Environmental Engineering. 13(11), 692-697 Retrieved from https://publications.waset.org/10010924/developing-improvements-to-multi-hazard-risk-assessments
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Balaei, B., Wilkinson, S., & Potangaroa, R. (2019). Social capacities in fostering water supply resilience in Vanuatu. Disaster Prevention and Management: An International Journal. 28(5), 706-720
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Li, X., Liu, Y., Wilkinson, S., & Liu, T. (2019). Driving forces influencing the uptake of sustainable housing in New Zealand. Engineering, Construction and Architectural Management. 26(1), 46-65
[Journal article]Authored by: Wilkinson, S.
Aquino, DH., Wilkinson, S., Raftery, GM., & Potangaroa, R. (2019). Building back towards storm-resilient housing: Lessons from Fiji's Cyclone Winston experience. International Journal of Disaster Risk Reduction. 33, 355-364
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Sina, D., Chang-Richards, AY., Wilkinson, S., & Potangaroa, R. (2019). What does the future hold for relocated communities post-disaster? Factors affecting livelihood resilience. International Journal of Disaster Risk Reduction. 34, 173-183
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Noktehdan, M., Shahbazpour, M., Zare, MR., & Wilkinson, S. (2019). Innovation Management and Construction Phases in Infrastructure Projects. Journal of Construction Engineering and Management. 145(2)
[Journal article]Authored by: Wilkinson, S.
Sina, D., Chang-Richards, AY., Wilkinson, S., & Potangaroa, R. (2019). A conceptual framework for measuring livelihood resilience: Relocation experience from Aceh, Indonesia. World Development. 117, 253-265
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Balaei, B., Wilkinson, S., Potangaroa, R., Adamson, C., & Alavi-Shoshtari, M. (2019). Social factors affecting water supply resilience to disasters. International Journal of Disaster Risk Reduction. 37
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., Costello, SB., & Jang, H. (2018). Conceptual Client Value Index for Post Disaster Reconstruction Contracting Services. KSCE Journal of Civil Engineering. 22(4), 1067-1076
[Journal article]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., Costello, SB., & Jang, H. (2018). Achieving Postdisaster Reconstruction Success Based on Satisfactory Delivery of Client Values within Contractors' Services. Journal of Management in Engineering. 34(2)
[Journal article]Authored by: Wilkinson, S.
Balaei, B., Wilkinson, S., Potangaroa, R., Hassani, N., & Alavi-Shoshtari, M. (2018). Developing a Framework for Measuring Water Supply Resilience. Natural Hazards Review. 19(4)
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Francis, TR., Wilkinson, S., Mannakkara, S., & Chang-Richards, A. (2018). Post-disaster reconstruction in Christchurch: a “build back better” perspective. International Journal of Disaster Resilience in the Built Environment. 9(3), 239-248
[Journal article]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., & Costello, SB. (2018). Rethinking client value within construction contracting services. International Journal of Managing Projects in Business. 11(4), 1007-1025
[Journal article]Authored by: Wilkinson, S.
Che Ibrahim, CKI., Costello, SB., & Wilkinson, S. (2018). Making sense of team integration practice through the “lived experience” of alliance project teams. Engineering, Construction and Architectural Management. 25(5), 598-622
[Journal article]Authored by: Wilkinson, S.
Smith, NE., Costello, SB., & Wilkinson, S. (2018). Sticking it out: How influence and inclusion motivate women to stay in civil engineering. Proceedings of the Institution of Civil Engineers: Municipal Engineer. 171(3), 129-140
[Journal article]Authored by: Wilkinson, S.
Ghodrati, N., Wing Yiu, T., Wilkinson, S., & Shahbazpour, M. (2018). Role of Management Strategies in Improving Labor Productivity in General Construction Projects in New Zealand: Managerial Perspective. Journal of Management in Engineering. 34(6)
[Journal article]Authored by: Wilkinson, S.
Ghodrati, N., Yiu, TW., & Wilkinson, S. (2018). Unintended consequences of management strategies for improving labor productivity in construction industry. Journal of Safety Research. 67, 107-116
[Journal article]Authored by: Wilkinson, S.
Ghodrati, N., Yiu, TW., Wilkinson, S., & Shahbazpour, M. (2018). A new approach to predict safety outcomes in the construction industry. Safety Science. 109, 86-94
[Journal article]Authored by: Wilkinson, S.
Adafin, J., Rotimi, JOB., & Wilkinson, S. (2020). Risk impact assessments in project budget development: quantity surveyors' perspectives. International Journal of Construction Management. 20(1), 13-28
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Cardwell, R., Smith, N., Brown, C., & Wilkinson, S. (2017). The Built Environment and Human Wellbing.
[Journal article]Authored by: Wilkinson, S.
Davies, K., Wilkinson, S., & McMeel, D. (2017). Baby steps with BIM–learning to walk the talk.
[Journal article]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., Costello, SB., & Jang, H. (2017). Comparative analysis of public and private client values for post disaster reconstruction services.
[Journal article]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., & Costello, SB. (2017). Exploring construction client values and qualities. Built Environment Project and Asset Management.
[Journal article]Authored by: Wilkinson, S.
Sapeciay, Z., Wilkinson, S., & Costello, SB. (2017). Building organisational resilience for the construction industry. International Journal of Disaster Resilience in the Built Environment.
[Journal article]Authored by: Wilkinson, S.
Che Ibrahim, CKI., Costello, SB., & Wilkinson, S. (2017). Validation of a team integration assessment tool in road infrastructure alliance projects. International Journal of Construction Management. 17(2), 151-164
[Journal article]Authored by: Wilkinson, S.
Bassett, M., Wilkinson, S., & Mannakkara, S. (2017). Legislation for building back better of horizontal infrastructure. Disaster Prevention and Management. 26(1), 94-104
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., Wilkinson, S., Seville, E., & Brunsdon, D. (2017). Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management. 24(1), 2-20
[Journal article]Authored by: Wilkinson, S.
Davies, K., McMeel, DJ., & Wilkinson, S. (2017). Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management. 24(1), 78-93
[Journal article]Authored by: Wilkinson, S.
Wood, AJ., Zhou, L., Wilkinson, S., & Douglas, RG. (2017). Effectiveness of extensive sinus surgery with post-operative medical management for chronic rhinosinusitis. Journal of Laryngology and Otology. 131(S2), S19-S24
[Journal article]Authored by: Wilkinson, S.
Sapeciay, Z., Wilkinson, S., & Costello, SB. (2017). Building organisational resilience for the construction industry: New Zealand practitioners’ perspective. International Journal of Disaster Resilience in the Built Environment. 8(1), 98-108
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, YA., Rapp, R., Wilkinson, S., von Meding, J., & Haigh, R. (2017). Disaster recovery project management: A critical service. International Journal of Project Management. 35(5), 783-787
[Journal article]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., & Costello, SB. (2017). Exploring construction client values and qualities: Are these two distinct concepts in construction studies?. Built Environment Project and Asset Management. 7(3), 234-252
[Journal article]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., Costello, SB., & Jang, H. (2017). Client values within post-disaster reconstruction contracting services. Disaster Prevention and Management. 26(3), 348-360
[Journal article]Authored by: Wilkinson, S.
Che Ibrahim, CKI., Costello, SB., Wilkinson, S., & Walker, D. (2017). Innovation in alliancing for improved delivery of road infrastructure projects. International Journal of Managing Projects in Business. 10(4), 700-720
[Journal article]Authored by: Wilkinson, S.
Davies, K., Wilkinson, S., & McMeel, D. (2017). A review of specialist role definitions in bim guides and standards. Journal of Information Technology in Construction. 22, 185-203
[Journal article]Authored by: Wilkinson, S.
Baharuddin, HEA., Ibrahim, CKIC., Costello, SB., & Wilkinson, S. (2017). Managing stakeholders through alliances: A case study of a megaproject in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law. 170(4), 151-160
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., Wilkinson, S., Seville, E., & Brunsdon, D. (2017). An organizational capability framework for earthquake recovery. Earthquake Spectra. 33(4), 1257-1278
[Journal article]Authored by: Wilkinson, S.
Babaeian Jelodar, M., Yiu, TW., & Wilkinson, S. (2017). Assessing Contractual Relationship Quality: Study of Judgment Trends among Construction Industry Participants. Journal of Management in Engineering. 33(1)
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Adafin, J., Rotimi, JOB., Wilkinson, S., & Windapo, AO. (2017). Achieving design-stage elemental cost planning accuracy: Case study of New Zealand. International Journal of Economics and Management Engineering. 11(1), 115-120
[Journal article]Authored by: Wilkinson, S.
Adafin, J., Rotimi, JOB., & Wilkinson, S. (2016). Risk impact assessments in project budget development: architects’ perspectives. Architectural Engineering and Design Management. 12(3), 189-204
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Egbelakin, T., Wilkinson, S., Ingham, J., Potangaroa, R., & Sajoudi, M. (2017). Incentives and Motivators for Improving Building Resilience to Earthquake Disaster. Natural Hazards Review. 18(4)
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Babaeianjelodar, M., Yiu, TW., & Wilkinson, S. (2016). A conceptualisation of relationship quality in construction procurement.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., & Chang-Richards, A. (2016). An assessment of the likely changes to construction businesses in Christchurch post recovery.
[Journal article]Authored by: Wilkinson, S.
Domingo, N., & Wilkinson, S. (2016). 7th-9th September, 2016| University of Auckland Auckland, New Zealand.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., & Wilkinson, S. (2016). The Insurance Industry and Integrated Project Management Frameworks in Post-Disaster Reconstruction: Recovery after the 2010 and 2011 Christchurch Earthquakes. Rebuilding Asia following Natural Disasters: Approaches to Reconstruction in the Asia-Pacific Region. 339, 367
[Journal article]Authored by: Wilkinson, S.
Liu, T., Wang, Y., & Wilkinson, S. (2016). Identifying critical factors affecting the effectiveness and efficiency of tendering processes in Public-Private Partnerships (PPPs): A comparative analysis of Australia and China. International Journal of Project Management. 34(4), 701-716
[Journal article]Authored by: Wilkinson, S.
Che Ibrahim, CKI., Costello, SB., & Wilkinson, S. (2016). Application of a team integration performance index in road infrastructure alliance projects. Benchmarking. 23(5), 1341-1362
[Journal article]Authored by: Wilkinson, S.
Ying, FJ., Wilkinson, S., & Corner, J. (2016). Challenges to seismic rehabilitation decision process in New Zealand: a focus of decision environment. International Journal of Strategic Property Management. 20(3), 305-315
[Journal article]Authored by: Wilkinson, S., Ying, J.
Mannakkara, S., & Wilkinson, S. (2016). Selecting an institutional mechanism for Building Back Better: Lessons from Victorian bushfires recovery. International Journal of Disaster Risk Reduction. 19, 273-279
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., Chang-Richards, AY., Sapeciay, Z., & Costello, SB. (2016). Improving construction sector resilience. International Journal of Disaster Resilience in the Built Environment. 7(2), 173-185
[Journal article]Authored by: Wilkinson, S.
Jelodar, MB., Yiu, TW., & Wilkinson, S. (2016). Dispute manifestation and relationship quality in practice. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 8(1), C4515003
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Jelodar, MB., Yiu, TW., & Wilkinson, S. (2016). Relationship-Quality Judgment Model for Construction Project Procurement: A Conjoint Measurement. Journal of Construction Engineering and Management. 142(7)
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Jelodar, MB., Yiu, TW., & Wilkinson, S. (2016). A conceptualisation of relationship quality in construction procurement. International Journal of Project Management. 34(6), 997-1011
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Adafin, J., Rotimi, JOB., & Wilkinson, S. (2016). Determining Significant Risks in the Variability between Design-Stage Elemental Cost Plan and Final Tender Sum. Journal of Management in Engineering. 32(6)
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Babaeian Jelodar, M., Wing Yiu, T., & Wilkinson, S. (2015). Systematic Representation of Relationship Quality in Conflict and Dispute: for Construction Projects.
[Journal article]Authored by: Wilkinson, S.
Jafarzadeh, R., Ingham, JM., & Wilkinson, S. (2015). NEES: A Database for Seismic Retrofit Construction Cost of Concrete and Steel Framed Schools in Iran.
[Journal article]Authored by: Wilkinson, S.
Goodfellow, P., Wilkinson, S., Hazel, N., Bateman, T., Liddle, M., Wright, S., . . . Factor, F. (2015). Effective resettlement of young people: Lessons from Beyond Youth Custody.
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., Potangaroa, R., & Wilkinson, S. (2015). Building Back Better Roadmap for the Rehabilitation of 310 Agricultural Businesses in the Gaza Strip.
[Journal article]Authored by: Wilkinson, S.
Davies, K., McMeel, D., & Wilkinson, S. (2015). Soft skill requirements in a BIM project team.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Wilkinson, S., Seville, E., & Brunsdon, D. (2015). Resourcing the Canterbury rebuild.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., Rapp, R., Wilkinson, S., Von Meding, J., & Haigh, R. (2015). Call for papers: International Journal of Project Management. International Journal of Project Management. 6(33), 1193-1194
[Journal article]Authored by: Wilkinson, S.
Azizi, NSM., & Wilkinson, S. (2015). Motivation Factors in Energy Saving Behaviour between Occupants in Green and Conventional Buildings--Malaysia Case Study. International Journal of Environmental Science and Development. 6(7), 491
[Journal article]Authored by: Wilkinson, S.
Mokhtar Azizi, NS., Wilkinson, S., & Fassman, E. (2015). Strategies for improving energy saving behaviour in commercial buildings in Malaysia. Engineering, Construction and Architectural Management. 22(1), 73-90
[Journal article]Authored by: Wilkinson, S.
Che Ibrahim, CKI., Costello, SB., & Wilkinson, S. (2015). A fuzzy approach to developing scales for performance levels of alliance team integration assessment. Journal of Construction Engineering and Management. 141(5)
[Journal article]Authored by: Wilkinson, S.
Ibrahim, CKIC., Costello, SB., & Wilkinson, S. (2015). Establishment of quantitative measures for team integration assessment in alliance projects. Journal of Management in Engineering. 31(5)
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2015). Supporting post-disaster social recovery to build back better. International Journal of Disaster Resilience in the Built Environment. 6(2), 126-139
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., Rapp, R., Wilkinson, S., Von Meding, J., & Haigh, R. (2015). Call for papers: International journal of project management. Special issue "managing disaster recovery projects". International Journal of Project Management. 33(6), 1193-1194
[Journal article]Authored by: Wilkinson, S.
Azizi, NSM., Wilkinson, S., & Fassman, E. (2015). An analysis of occupants response to thermal discomfort in green and conventional buildings in New Zealand. Energy and Buildings. 104, 191-198
[Journal article]Authored by: Wilkinson, S.
Liu, T., & Wilkinson, S. (2015). Critical factors affecting the viability of using public-private partnerships for prison development. Journal of Management in Engineering. 31(5)
[Journal article]Authored by: Wilkinson, S.
Azizi, NSM., Wilkinson, S., & Fassman, E. (2015). Do occupants in green buildings practice better energy saving behaviour in computer usage than occupants in conventional buildings?. Journal of Green Building. 10(4), 178-193
[Journal article]Authored by: Wilkinson, S.
Che Ibrahim, CKI., Costello, SB., & Wilkinson, S. (2015). Key indicators influencing the management of team integration in construction projects. International Journal of Managing Projects in Business. 8(2), 300-323
[Journal article]Authored by: Wilkinson, S.
Che Ibrahim, CKI., Costello, SB., & Wilkinson, S. (2015). Development of an assessment tool for team integration in alliance projects. International Journal of Managing Projects in Business. 8(4), 813-827
[Journal article]Authored by: Wilkinson, S.
Noktehdan, M., Shahbazpour, M., & Wilkinson, S. (2015). Driving innovative thinking in the New Zealand construction industry. Buildings. 5(2), 297-309
[Journal article]Authored by: Wilkinson, S.
Jelodar, MB., Yiu, TW., & Wilkinson, S. (2015). Systematic representation of relationship quality in conflict and dispute: For construction projects. Construction Economics and Building. 15(1), 89-103
[Journal article]Authored by: Babaeianjelodar, M., Wilkinson, S.
Adafin, J., Rotimi, JOB., & Wilkinson, S. (2015). Why do the design stage elemental cost plan and final tender sum differ in new zealand?. Journal of Financial Management of Property and Construction. 20(2), 116-131
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Egbelakin, T., Wilkinson, S., Potangaroa, R., & Rotimi, J. (2015). Stakeholders’ practices: a challenge to earthquake risk mitigation decisions. International Journal of Strategic Property Management. 19(4), 395-408
[Journal article]Authored by: Potangaroa, R., Rotimi, J., Wilkinson, S.
Egbelakin, T., Wilkinson, S., & Ingham, J. (2015). Integrated framework for enhancing earthquake risk mitigation decisions. International Journal of Construction Supply Chain Management. 5(2), 34-51
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Wilkinson, S., Seville, E., & Brunsdon, D. (2014). Workforce behaviour and business responses: Case studies of construction organisations.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, SUZANNE., Costello, S., & Sajoudi, MASUD. (2014). What is resilience?. Build I141. , 43-67
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., Chang-Richards, AY., Seville, E., & Brunsdon, D. (2014). Assisting Self-Managing Rebuilding Owners in New Zealand to Rebuild their Homes: Lessons for New Zealand from the 2009 Victoria Bush Fire Recovery.
[Journal article]Authored by: Wilkinson, S.
Potangaroa, R., Santosa, H., & Wilkinson, S. (2014). The Application of Quality of Life Metrics.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., Chang-Richards, AY., Sapeciay, Z., & Organisations, R. (2014). Investment in the construction sector to reduce disaster risk management. United Nations Office for Disaster Risk Reduction (UNISDR).
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Wilkinson, S., Seville, E., & Brunsdon, D. (2014). Provision of temporary accommodation for construction workers.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., Wilkinson, S., Seville, E., & Brunsdon, D. (2014). Resourcing issues following earthquake disaster. Encyclopedia of Earthquake Engineering.
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., Wilkinson, S., & Francis, TR. (2014). Build Back Better” principles for reconstruction. Encyclopedia of Earthquake Engineering; Beer, M., Kougioumtzoglou, IA, Patelli, E., Au, S.-K., Eds. , 1-12
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Wilkinson, S., Seville, E., & Brunsdon, D. (2014). Workforce behaviour and business responses.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., & Ma, C. (2014). 13 New Zealand–new directions for construction R&D. R&D Investment and Impact in the Global Construction Industry. , 207
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., Wilkinson, SJ., Seville, E., & Brundson, D. (2014). Housing the workforce following the Canterbury earthquakes in New Zealand.
[Journal article]Authored by: Wilkinson, S.
Liu, T., & Wilkinson, S. (2014). Large-scale public venue development and the application of Public-Private Partnerships (PPPs). International Journal of Project Management. 32(1), 88-100
[Journal article]Authored by: Wilkinson, S.
Mokhtar Azizi, NS., Wilkinson, S., & Fassman, E. (2014). Management practice to achieve energy-efficient performance of green buildings in New Zealand. Architectural Engineering and Design Management. 10(1-2), 25-39
[Journal article]Authored by: Wilkinson, S.
Jafarzadeh, R., Ingham, JM., Wilkinson, S., González, V., & Aghakouchak, AA. (2014). Application of artificial neural network methodology for predicting seismic retrofit construction costs. Journal of Construction Engineering and Management. 140(2)
[Journal article]Authored by: Wilkinson, S.
Jafarzadeh, R., Wilkinson, S., González, V., Ingham, JM., & Amiri, GG. (2014). Predicting seismic retrofit construction cost for buildings with framed structures using multilinear regression analysis. Journal of Construction Engineering and Management. 140(3)
[Journal article]Authored by: Wilkinson, S.
Liu, T., & Wilkinson, S. (2014). Using public-private partnerships for the Building and management of school assets and services. Engineering, Construction and Architectural Management. 21(2), 206-223
[Journal article]Authored by: Wilkinson, S.
Guo, F., Chang-Richards, Y., Wilkinson, S., & Li, TC. (2014). Effects of project governance structures on the management of risks in major infrastructure projects: A comparative analysis. International Journal of Project Management. 32(5), 815-826
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., Wilkinson, S., & Potangaroa, R. (2014). Build back better: Implementation in Victorian bushfire reconstruction. Disasters. 38(2), 267-290
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Stevenson, JR., Chang-Richards, Y., Conradson, D., Wilkinson, S., Vargo, J., Seville, E., . . . Brunsdon, D. (2014). Organizational networks and recovery following the Canterbury earthquakes. Earthquake Spectra. 30(1), 555-575
[Journal article]Authored by: Wilkinson, S.
Jafarzadeh, R., Ingham, JM., & Wilkinson, S. (2014). A seismic retrofit cost database for buildings with a framed structure. Earthquake Spectra. 30(2), 625-637
[Journal article]Authored by: Wilkinson, S.
Hewitt, J., Wilkinson, S., & Potangaroa, R. (2014). Change and continuity in post-katrina new Orleans. Proceedings of the Institution of Civil Engineers: Urban Design and Planning. 167(4), 156-164
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2014). Re-conceptualising “Building Back Better” to improve post-disaster recovery. International Journal of Managing Projects in Business. 7(3), 327-341
[Journal article]Authored by: Wilkinson, S.
Rotimi, JOB., & Wilkinson, S. (2014). Improving environmental management legislation to facilitate post-disaster reconstruction. International Journal of Disaster Resilience in the Built Environment. 5(1), 23-37
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Egbelakin, T., Wilkinson, S., & Ingham, J. (2014). Economic impediments to successful seismic retrofitting decisions. Structural Survey. 32(5), 449-466
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2013). Post-disaster legislation for building back better. Constr. Law J. 29(8), 495-506
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Seville, E., Wilkinson, S., & Walker, B. (2013). Building natural disaster response capacity: Sound workforce strategies for recovery and reconstruction in APEC economies.
[Journal article]Authored by: Wilkinson, S.
Kipa, M., Potangaroa, R., & Wilkinson, S. (2013). Iwi resilience?: the Maori response following the February 22, 2011 Christchurch Earthquake.
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2013). Build back better applications for stakeholder management in post-disaster environments. Earthquake Engineering Research Institute: Oakland, CA, USA.
[Journal article]Authored by: Wilkinson, S.
Davies, K., McMeel, D., & Wilkinson, S. (2013). Mapping roles in an altered landscape: The impact of BIM on designer-constructor relationships.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, A., Wilkinson, S., Seville, E., & Brunsdon, D. (2013). Resourcing of the Canterbury rebuild: Case studies of construction organisations.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Seville, E., Wilkinson, S., & Walker, B. (2013). Building natural disaster response capacity: sound workforce strategies for recovery and.
[Journal article]Authored by: Wilkinson, S.
Roumboutsos, A., Liu, T., & Wilkinson, S. (2013). Can the pilot public-private partnerships project be applied in future urban rail development?. Built Environment Project and Asset Management.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, A., Wilkinson, S., Seville, E., & Brunsdon, D. (2013). Myths and realities of reconstruction workers’ accommodation.
[Journal article]Authored by: Wilkinson, S.
Olorunkiya, JO., Wilkinson, S., Fassman, EA., & Stuart, D. (2013). Eliciting stakeholders’ preferences for low-impact design incentives: Conjoint analysis approach. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 5(4), 180-190
[Journal article]Authored by: Wilkinson, S.
Chang‐Richards, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2013). Resource challenges for housing reconstruction. Disaster Prevention and Management: An International Journal.
[Journal article]Authored by: Wilkinson, S.
Mokhtar Azizi, NS., Fassman, E., Wilkinson, S., & Che Ani, AI. (2013). Management practice to achieve energy efficiency performance: Green versus conventional office building in Malaysia. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 5(4), 205-214
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2013). Resource challenges for housing reconstruction: A longitudinal study of the Australian bushfires. Disaster Prevention and Management: An International Journal. 22(2), 172-181
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Izam Ibrahim, K., Costello, SB., & Wilkinson, S. (2013). Key practice indicators of team integration in construction projects: a review. Team Performance Management: An International Journal. 19(3-4), 132-152
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2013). Build Back Better principles for post-disaster structural improvements. Structural Survey. 31(4), 314-327
[Journal article]Authored by: Wilkinson, S.
Liu, T., & Wilkinson, S. (2013). Can the pilot public-private partnerships project be applied in future urban rail development?: A case study of Beijing Metro Line 4 project. Built Environment Project and Asset Management. 3(2), 250-263
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2013). 'Build back better' principles for land-use planning. Proceedings of the Institution of Civil Engineers: Urban Design and Planning. 166(5), 288-295
[Journal article]Authored by: Wilkinson, S.
Che Ibrahim, CKI., Costello, SB., & Wilkinson, S. (2013). Development of a conceptual team integration performance index for alliance projects. Construction Management and Economics. 31(11), 1128-1143
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2013). Build back better: Lessons from Sri Lanka's recovery from the 2004 Indian Ocean tsunami. Archnet-IJAR: International Journal of Architectural Research. 7(3), 108-121
[Journal article]Authored by: Wilkinson, S.
Egbelakin, T., Wilkinson, S., Potangaroa, R., & Ingham, J. (2013). Improving regulatory frameworks for earthquake risk mitigation. Building Research and Information. 41(6), 677-689
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Shaharuddin, S., Khalil, N., Saleh, AA., Saharuddin, S., Ali, IM., Zaidi, MA., . . . Wilkinson, S. (2012). Review of Significant Maintenance Criteria for Tropical Green Roofs in Malaysia. Procedia-Social and Behavioral Sciences. 50, 442-451
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Wilkinson, S., & Seville, E. (2012). Resourcing the Canterbury rebuild: Issues and outlook.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Seville, E., Wilkinson, S., & Brunsdon, D. (2012). APEC project on SME Resilience, Resilient Organisations monthly reports Report 5: Challenges and Opportunities for Construction Organisations..
[Journal article]Authored by: Wilkinson, S.
Chang, Y., Wilkinson, S., & Seville, E. (2012). Resourcing the Canterbury rebuild: Issues and outlook. A supplementary report April 2012.
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, AY., Wilkinson, S., & Seville, E. (2012). Resourcing the Canterbury Rebuild: Changes and Emerging Themes.
[Journal article]Authored by: Wilkinson, S.
Olorunkiya, J., Fassman, E., & Wilkinson, S. (2012). Risk: A fundamental barrier to the implementation of low impact design infrastructure for urban stormwater control. Journal of Sustainable Development. 5(9), 27
[Journal article]Authored by: Wilkinson, S.
Chang, Y., Wilkinson, S., Seville, E., & Potangaroa, R. (2012). Changes in resource need for post-disaster reconstruction: A longitudinal study in China. Building Research and Information. 40(3), 327-336
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2012). Resourcing for postdisaster reconstruction: A comparative study of Indonesia and China. Disaster Prevention and Management: An International Journal. 21(1), 7-21
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2012). Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management. 19(5), 557-580
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2012). Build back better principles for economic recovery: case study of the Victorian bushfires.. Journal of business continuity & emergency planning. 6(2), 164-173
[Journal article]Authored by: Wilkinson, S.
Tookey, JE., Liu, T., & Wilkinson, S. (2011). Adopting innovative procurement techniques. Construction Innovation.
[Journal article]Authored by: Wilkinson, S.
Esa, M., & Abdulsamad, Z. (2011). Considering learning, unlearning in professional development for construction project managers: A pilot study. International Proceedings of Economics Development & Research. 15, 210
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., & Chang, Y. (2011). Hasty Code changes may slow recovery. Build Magazine of BRANZ.
[Journal article]Authored by: Wilkinson, S.
Zare, MR., Wilkinson, S., & Potangaroa, R. (2011). Earthquake damage in wastewater systems and post-earthquake repair methods; limitation and practice.
[Journal article]Authored by: Wilkinson, S.
Azizi, MS., Fassman, E., & Wilkinson, S. (2011). Risks associated in implementation of green buildings. Auckland, New Zealand: Department of Civil Environmental Engineering.
[Journal article]Authored by: Wilkinson, S.
Boiser, A., Wilkinson, S., & Chang, AY. (2011). Skills availability for housing repair and reconstruction in Christchurch.
[Journal article]Authored by: Wilkinson, S.
Ibrahim, CKI., Costello, SB., & Wilkinson, S. (2011). Key relationship oriented indicators of team integration in construction projects. International Journal of Innovation, Management and Technology. 2(6), 441
[Journal article]Authored by: Wilkinson, S.
Chang, Y., Wilkinson, S., Brunsdon, D., Seville, E., & Potangaroa, R. (2011). An integrated approach: Managing resources for post-disaster reconstruction. Disasters. 35(4), 739-765
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2011). Donor-driven resource procurement for post-disaster reconstruction: Constraints and actions. Habitat International. 35(2), 199-205
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2011). Identifying factors affecting resource availability for post-disaster reconstruction: A case study in China. Construction Management and Economics. 29(1), 37-48
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Liu, T., & Wilkinson, S. (2011). Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation. 11(4), 452-469
[Journal article]Authored by: Wilkinson, S.
Potangaroa, R., Wilkinson, S., Zare, M., & Steinfort, P. (2011). The management of portable toilets in the eastern suburbs of christchurch after the february 22, 2011 earthquake. Australasian Journal of Disaster and Trauma Studies. 2011(2), 35-48
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Egbelakin, T., Wilkinson, S., Potangaroa, R., & Ingham, J. (2011). Enhancing seismic risk mitigation decisions: A motivational approach. Construction Management and Economics. 29(10), 1003-1016
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Egbelakin, TK., Wilkinson, S., Potangaroa, R., & Ingham, J. (2011). Challenges to successful seismic retrofit implementation: A socio-behavioural perspective. Building Research and Information. 39(3), 286-300
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
OLORUNKIYA, J., ICIOB, A., FASSMAN, DE., & WILKINSON, S. (2010). RISK AS A FUNDAMENTAL BARRIER TO ADOPTION OF LOW IMPACT DESIGN (LID) TECHNOLOGIES.
[Journal article]Authored by: Wilkinson, S.
Rwelamila, PMD., Brooker, P., & Wilkinson, S. (2010). Construction mediation in South Africa. Mediation in the Construction Industry: An International Review, Spon Press, New York, NY. , 121-132
[Journal article]Authored by: Wilkinson, S.
Zare, MR., Wilkinson, S., & Potangaroa, R. (2010). Vulnerability of wastewater treatment plants and wastewater pumping stations to earthquakes. International Journal of Strategic Property Management. 14(4), 408-420
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S. (2010). 6 Construction mediation in New Zealand. Mediation in the Construction Industry: An International Review. , 108
[Journal article]Authored by: Wilkinson, S.
Brooker, P., & Wilkinson, S. (2010). 10 Evaluation of construction mediation. Mediation in the Construction Industry: An International Review. , 183
[Journal article]Authored by: Wilkinson, S.
Potangaroa, R., Chang, Y., Zuo, K., & Wilkinson, S. (2010). Structural quality control in the field.
[Journal article]Authored by: Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2010). Interpreting resourcing bottlenecks of post‐Wenc huan earthquake reconstruction in China. International Journal of Strategic Property Management. 14(4), 314-331
[Journal article]Authored by: Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2010). Resourcing challenges for post-disaster housing reconstruction: A comparative analysis. Building Research and Information. 38(3), 247-264
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2010). In terpreting resourcing bottleneck s of post-Wenc huan earthquake reconstruction in China. International Journal of Strategic Property Management. 14(4), 314-331
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Zare, MR., Wilkinson, S., & Potangaroa, R. (2010). Vulnerability of Wastewater Treatment Plants and Wastewater Pumping stations to earthquakes. International Journal of Strategic Property Management. 14(4), 408-420
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Chang, Y., Wilkinson, S., Seville, E., & Potangaroa, R. (2010). Resourcing for a resilient post-disaster reconstruction environment. International Journal of Disaster Resilience in the Built Environment. 1(1), 65-83
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Egbelakin, TK., & Wilkinson, S. (2010). Sociological and behavioural impediments to earthquake hazard mitigation. International Journal of Disaster Resilience in the Built Environment. 1(3), 310-321
[Journal article]Authored by: Wilkinson, S.
Baldry, MD., Hewitt, MJ., Ingirige, B., Lill, I., Liyanage, C., Lu, S., . . . Proverbs, D. (2009). Special issue Editorial Board.
[Journal article]Authored by: Wilkinson, S.
Chang, A., Potangaroa, R., Wilkinson, S., Seville, E., & Zuo, K. (2009). Empowerment and capacity building: recovery lessons from an earthquake in China.
[Journal article]Authored by: Wilkinson, S.
Ali, NANA., & Wilkinson, S. (2009). THE IDEAL CONTRUCTION DISPUTE RESOLVER–PROFESSIONAL VIEWPOINT ON USERS’EXPECTATIONS.
[Journal article]Authored by: Wilkinson, S.
Hewitt, J., Potangaroa, R., & Wilkinson, S. (2009). Levels of governance in post-disaster urban planning. Proceedings of the Institution of Civil Engineers: Urban Design and Planning. 162(2), 71-78
[Journal article]Authored by: Potangaroa, R., Wilkinson, S.
Rotimi, JO., Wilkinson, S., Zuo, K., & Myburgh, D. (2009). Legislation for effective post-disaster reconstruction. International Journal of Strategic Property Management. 13(2), 143-152
[Journal article]Authored by: Rotimi, J., Wilkinson, S.
Zuo, K., Potangaroa, R., Wilkinson, S., & Rotimi, JOB. (2009). A project management prospective in achieving a sustainable supply chain for timber procurement in Banda Aceh, Indonesia. International Journal of Managing Projects in Business. 2(3), 386-400
[Journal article]Authored by: Potangaroa, R., Rotimi, J., Wilkinson, S.
Egbelakin, T., & Wilkinson, S. (2008). Factors affecting motivation for improved seismic retrofit implementation in Australian Earthquake Engineering (AEES). Ballarat, Victoria, Australia, Australian Earthquake Engineering (AEES).
[Journal article]Authored by: Wilkinson, S.
Rotimi, JO., Wilkinson, S., & Zuo, K. (2008). The Building Act and Reconstruction Programmes in New Zealand: Matters Arising. Building Abroad: Procurement of Construction and Reconstruction Projects in the International Context. , 23-25
[Journal article]Authored by: Wilkinson, S.
Seville, E., Myburgh, D., & Wilkinson, S. (2008). Post Disaster Reconstruction Research: An Industry Update.
[Journal article]Authored by: Wilkinson, S.
Myburgh, D., Seville, E., & Wilkinson, S. (2008). Summary of Learnings from the 4th International I-REC Conference: Building Resilience-Achieving Effective Post-Disaster Reconstruction.
[Journal article]Authored by: Wilkinson, S.
Myburgh, D., Wilkinson, S., & Seville, E. (2008). Post-Disaster Reconstruction Research in New Zealand: An industry update..
[Journal article]Authored by: Wilkinson, S.
Seville, E., Brunsdon, D., Dantas, A., Le Masurier, J., Wilkinson, S., & Vargo, J. (2008). Organisational resilience: Researching the reality of New Zealand organisations. Journal of Business Continuity & Emergency Planning. 2(2), 258-266
[Journal article]Authored by: Wilkinson, S.
Singh, B., & Wilkinson, S. (2008). Post-disaster resource availability following a Wellington earthquake: aggregates, concrete and cement. I-Rec 2008 Building Resilience: Achieving Effective Post-Disaster Reconstruction.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., & Farhi, C. (2008). Could the NEC be widely used in New Zealand?. Proceedings of Institution of Civil Engineers: Management, Procurement and Law. 161(3), 107-113
[Journal article]Authored by: Wilkinson, S.
Lobo, YB., & Wilkinson, S. (2008). New approaches to solving the skills shortages in the New Zealand construction industry. Engineering, Construction and Architectural Management. 15(1), 42-53
[Journal article]Authored by: Wilkinson, S.
Li, W., & Wilkinson, S. (2006). Potential for international business consultancies in wastewater treatment in China. Journal of Technology Management in China. 1(3), 292
[Journal article]Authored by: Wilkinson, S.
Le Masurier, J., & Seville, E. (2006). Barriers to post disaster reconstruction: Report on workshop.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., Masurier, JL., & Seville, E. (2006). Barriers to post disaster reconstruction. Report onworkshop. Wellington.
[Journal article]Authored by: Wilkinson, S.
Seville, E., Brunsdon, D., Dantas, A., Le Masurier, J., Wilkinson, S., & Vargo, J. (2006). Building organisational resilience: a New Zealand approach. Resilient Organisations Research Programme. Disponível em: www. resorgs. org. nz.
[Journal article]Authored by: Wilkinson, S.
Lobo, Y., & Wilkinson, S. (2006). The effects of occupational licensing on skills needs in the building industry: Evidence from New Zealand. Construction Economics and Building. 6(2), 55-63
[Journal article]Authored by: Wilkinson, S.
Seville, E., Brunsdon, D., Dantas, A., Le Masurier, J., Wilkinson, S., & Vargo, J. (2006). Building Organisational Resilience.
[Journal article]Authored by: Wilkinson, S.
Wei, L., & Wilkinson, S. (2006). Potential for international business consultancies in wastewater treatment in China. Journal of technology management in China.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S. (2006). Client handling models for continuity of service. The Management of Complex Projects: A Relationship Approach. , 147-63
[Journal article]Authored by: Wilkinson, S.
Seville, E., Brunsdon, D., Dantas, A., Le Masurier, J., Wilkinson, S., & Vargo, J. (2006). Building organisational resilience: A summary of key research findings.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., & Gupta, S. (2005). The Adaptability of the RIBA Plan of Work with the Design and build Procurement Option. Construction Information Quarterly. 7(1), 6-9
[Journal article]Authored by: Wilkinson, S.
Rotimi, J., Le Masurier, J., & Wilkinson, S. (2005). The regulatory Framework for Effective Post-disaster Reconstruction. New Zealand.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., Gupta, S., & Le Masurier, J. (2005). The development of a contractual framework for disaster reconstruction. Understanding the Construction Business and Companies in the New Millennium. 44
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S. (2003). The New Zealand Standard Conditions of Contract. The Contract in Successful Project Management, E. Henriod and JL Masurier, eds., Centre for Advanced Engineering, University of Canterbury Campus, Christchurch.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., & Scofield, RL. (2002). Integrated management curriculum for civil engineers and architects. Journal of Professional Issues in Engineering Education and Practice. 128(3), 125-130
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S. (2001). An Analysis of the Use of Information Technology for Project Management in the New Zealand Construction Industry. Construction Economics and Building. 1(2), 47-56
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S. (2001). An analysis of the problems faced by project management companies managing construction projects. Engineering, Construction and Architectural Management. 8(3), 160-170
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S. (1998). THE UNIVERSITY/INDUSTRY COLLABORATION PROCESS. Building Education and Research. , 136
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S. (1996). Barriers to Life Cycle Costing Use in the New Zealand Construction Industry. CIB REPORT. , 447-456
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S. (1996). The factors affecting the career choice of male and female civil engineering students in the UK. Career Development International. 1(5), 45-50
[Journal article]Authored by: Wilkinson, S.
Wilkinson, SJ. (1992). Looking to America: how to improve the role of women in civil engineering. The Woman Engineer. 14(16), 12-13
[Journal article]Authored by: Wilkinson, S.
Jafarzadeh, R., Ingham, JM., & Wilkinson, S.A Seismic Retrofit Cost Database for Buildings Having a Framed Structure.
[Journal article]Authored by: Wilkinson, S.
Nwadike, A., & Wilkinson, S.Building Code Amendment Process: A Case Study of New Zealand.
[Journal article]Authored by: Wilkinson, S.
Nwadike, A., Wilkinson, S., & Clifton, C.Improving disaster resilience through effective building code compliance.
[Journal article]Authored by: Wilkinson, S.
Elkhidir, E., Mannakkara, S., & Wilkinson, S.Developing a National Inter-City Resilience Network-Draft.
[Journal article]Authored by: Wilkinson, S.
Elkhidir, ME., Wilkinson, S., & Mannakkara, S.Urban Resilience: Exploring the benefits of a National Inter-City Collaboration and Knowledge Platform for New Zealand-Draft.
[Journal article]Authored by: Wilkinson, S.
Aquino, DHM., Wilkinson, S., Raftery, GM., & Potangaroa, R.Building back towards storm-resilient housing: Lessons from Fiji’s Cyclone Winston experience-Draft.
[Journal article]Authored by: Wilkinson, S.
Elkhidir, E., Mannakkara, S., & Wilkinson, S.Developing a National Inter-City Resilience Network.
[Journal article]Authored by: Wilkinson, S.
Fassman, E., & Wilkinson, S.Risk as a Fundamental Barrier to Adoption of Low Impact Design Technologies.
[Journal article]Authored by: Wilkinson, S.
Fassman, E., & Wilkinson, S.Global Thinking-Local Action: Adopting the Low Impact Design (LID) Technologies in Urban Stormwater Management.
[Journal article]Authored by: Wilkinson, S.
Aryal, A., & Wilkinson, S.Social impacts and community resilience through recovery: Nepal earthquake 2015.
[Journal article]Authored by: Wilkinson, S.
Zarinkamar, S., Quenneville, P., Wilkinson, S., & Poshdar, M.Identifying the factors of trust in new seismic-proofing technologies in New Zealand.
[Journal article]Authored by: Wilkinson, S.
Dianat, H., Wilkinson, S., Williams, P., Maxwell, K., & Mannakkara, S.From Indicators to Action: The Case of Auckland Ten Essentials of Sendai Framework.
[Journal article]Authored by: Wilkinson, S.
Sweya, LN., Wilkinson, S., & Kassenga, G.Resilience Improvement Needs for Public Water Supply Systems in Dar Es Salaam.
[Journal article]Authored by: Wilkinson, S.
Takada, S.Disaster Mitigation and the Experience of Civil Engineers in Asia.
[Journal article]Authored by: Wilkinson, S.
Balaei, B., Wilkinson, S., Potangaroa, R., & McFarlane, P.AN INNOVATIVE APPROACH TO MEASURING RESILIENCE BASED ON POST-EARTHQUAKE WATER DEMAND.
[Journal article]Authored by: Wilkinson, S.
Balaei, B., Wilkinson, S., & Potangaroa, R.Impact of social characteristics of communities on water supply system resilience.
[Journal article]Authored by: Wilkinson, S.
McClure, J., Wills, C., Johnston, D., Recker, C., Kemp, S., Helton, WS., . . . Vallance, S.A Focus on the Canterbury Earthquakes. Australasian Journal of Disaster and Trauma Studies. 2011, 2
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S.IMPLEMENTATION OF BUILD BACK BETTER IN VICTORIAN BUSHFIRE RECONSTRUCTION AND LESSONS LEARNT FOR NEW ZEALAND.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S.Beyond ‘business as usual’: Capability challenges in earthquake reconstruction in Christchurch, New Zealand.
[Journal article]Authored by: Wilkinson, S.
Azizi, NSM., Wilkinson, S., & Fassmanº, E.energy saving behaviour, energy efficiency, green buildings, conventional buildings.
[Journal article]Authored by: Wilkinson, S.
Egbelakin, T., Wilkinson, S., & Domingo, N.5th Building 2015 Resilience Conference Framework for Improving Property Owners Earthquake Disaster Preparedness Decisions.
[Journal article]Authored by: Wilkinson, S.
Egbelakin, T., Wilkinson, S., & Domingo, N.5th Building 2015 Resilience Conference Understanding the Roles of Property Investors and Insurers and Earthquake Risk Mitigation.
[Journal article]Authored by: Wilkinson, S.
BUILDING BACK BETTER Case Study of the 2010-2011 Canterbury, New Zealand Earthquake Sequence.
[Journal article]Authored by: Wilkinson, S.
BUILDING BACK BETTER Case Study of the 2010-2011 Canterbury, New Zealand Earthquake Sequence.
[Journal article]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S.Build Back Better Principles for Economic Recovery.
[Journal article]Authored by: Wilkinson, S.
Azizi, NSM., Wilkinson, S., & Fassman, E.Energy Saving Behaviour (ESB) Level of Practice-Comparison case study between green and conventional office building. Smart and Sustainable Built Environments. , 110
[Journal article]Authored by: Wilkinson, S.
Seville, E., Brunsdon, D., Dantas, A., Le Masurier, J., & Wilkinson, S.J. & Vargo, J.(2006). Building organisational resilience: A summary of key research findings. Resilient Organisations Research Programme, Christchurch, New Zealand, August.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., & Ying, FJ.The Application of Life Cycle Costing for Building Retrofit.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S., & Zuo, K.The Building Act and Reconstruction Programmes in New Zealand: Matters Arising.
[Journal article]Authored by: Wilkinson, S.
Zuo, K., & Wilkinson, S.buildingabroad procurement of construction and reconstruction projects in the international context.
[Journal article]Authored by: Wilkinson, S.
Wilkinson, S.ENCOURAGING LEARNING THROUGH SIMULATION AND INTER-UNIVERSITY COMPETITION.
[Journal article]Authored by: Wilkinson, S.
WILKINSON, S., & SCOFIELD, RL.TITLE: The influence of the New Zealand culture on construction activities.
[Journal article]Authored by: Wilkinson, S.

Book

Liu, T., & Wilkinson, SJ. (2022). Developing Urban Rail Using Public-Private Partnership: A Case Study of the Gold Coast Light Rail Project. In Competitive Government: Public Private Partnerships. (pp. 243 - 259).
[Chapter]Authored by: Wilkinson, S.
Pisini, SK., Thammadi, SP., & Wilkinson, S. (2021). Energy-efficient buildings for sustainable development. In Sustainable Civil Engineering: Principles and Applications. (pp. 79 - 94).
[Chapter]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., Costello, SB., Jang, H., & Aliakbarlou, H. (2020). Producing Work-Ready Graduate for the Construction Industry. In R. Roggema, & A. Roggema (Eds.) Smart and Sustainable Cities and Buildings. (pp. 605 - 615). Cham, Switzerland: Springer Nature Switzerland AG
[Chapter]Authored by: Wilkinson, S.
Noktehdan, M., Zare, MR., Adafin, J., Wilkinson, S., & Shahbazpour, M. (2020). Application of Fuzzy Analytic Hierarchy Process (AHP) for Ranking and Selection of Innovation in Infrastructure Project Management. In R. Roggema, & A. Roggema (Eds.) Smart and Sustainable Cities and Buildings. (pp. 147 - 170). Cham, Switzerland: Springer Nature Switzerland AG
[Chapter]Authored by: Wilkinson, S.
Mannakkara, S., Wilkinson, S., & Potangaroa, R.(2019). Resilient Post Disaster Recovery through Building Back Better. London, United Kingdom: Routledge
[Authored Book]Authored by: Potangaroa, R., Wilkinson, S.
Chang-Richards, A., Seville, E., Wilkinson, S., & Walker, B. (2019). Effects of Disasters on Displaced Workers. In A. Asgary (Ed.) Resettlement Challenges for Displaced Populations and Refugees. (pp. 185 - 195). Cham, Switzerland: Springer International Publishing AG
[Chapter]Authored by: Wilkinson, S.
Aryal, A., Wilkinson, S., & Chang-Richards, A. (2019). Community participation to build back better: evidence from the 2015 Nepal earthquakes. In A. Asgary (Ed.) Resettlement Challenges for Displaced Populations and Refugees. (pp. 175 - 183). Cham, Switzerland: Springer International Publishing AG
[Chapter]Authored by: Wilkinson, S.
Aryal, A., Wilkinson, S., & Chang-Richards, A. (2018). Community Participation to Build Back Better: Evidence from the 2015 Nepal Earthquakes. In A. Asgary (Ed.) Resettlement Challenges for Displaced Populations and Refugees. (pp. 175 - 183). Cham, Switzerland: Springer International Publishing AG
[Journal article]Authored by: Wilkinson, S.
Chang-Richards, Y., Wilkinson, S., Seville, E., & Potangaroa, R. (2016). Decentralizing a "top-down" post-disaster reconstruction: China's response to the 2008 wenchuan earthquake. In Rebuilding Asia Following Natural Disasters: Approaches to Reconstruction in the Asia-Pacific Region. (pp. 284 - 314).
[Chapter]Authored by: Potangaroa, R., Wilkinson, S.
Chang-Richards, Y., & Wilkinson, S. (2016). The Insurance Industry and Integrated Project Management Frameworks in Post-Disaster Reconstruction: Recovery after the 2010 and 2011 christchurch earthquakes. In Rebuilding Asia Following Natural Disasters: Approaches to Reconstruction in the Asia-Pacific Region. (pp. 339 - 366).
[Chapter]Authored by: Wilkinson, S.
Stevenson, J., Giovinazzi, S., Seville, E., Brown, C., Chang-Richards, Y., & Wilkinson, S. (2016). From disaster to opportunity: Reviving urban function after the Canterbury earthquakes. In Cities at Risk: Planning for and Recovering from Natural Disasters. (pp. 97 - 138).
[Chapter]Authored by: Wilkinson, S.
Potangaroa, R., Santosa, H., & Wilkinson, S. (2015). Disaster management: enabling resilience. In Disaster Management: Enabling Resilience. (pp. 227 - 265). : Springer, Cham
[Chapter]Authored by: Wilkinson, S.
Wilkinson, S., & Ma, C. (2014). New Zealand – new directions for construction R&D. In R and D Investment and Impact in the Global Construction Industry. (pp. 207 - 221).
[Chapter]Authored by: Wilkinson, S.
Wilkinson, S., Chang-Richards, AY., & Rotimi, JOB. (2014). Reconstruction Following Earthquake Disasters. In Encyclopedia of Earthquake Engineering. (pp. 1 - 11). : Springer Berlin Heidelberg
[Chapter]Authored by: Rotimi, J., Wilkinson, S.
Egbelakin, TEMITOPE., & Wilkinson, SUZANNE.(2014). Five drivers. http://www. buildmagazine. org. nz/articles/show/five-drivers/
[Discussion Paper]Authored by: Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2011). Resourcing for Post-Disaster Reconstruction: A Longitudinal Case Study Following the 2008 Earthquake in China. In Post-Disaster Reconstruction of the Built Environment: Rebuilding for Resilience. (pp. 51 - 69).
[Chapter]Authored by: Potangaroa, R., Wilkinson, S.
Rotimi, JO., Wilkinson, S., & Myburgh, D. (2011). Legislation for Effective Post-Disaster Reconstruction: Cases from New Zealand. In Post-Disaster Reconstruction of the Built Environment: Rebuilding for Resilience. (pp. 151 - 174).
[Chapter]Authored by: Rotimi, J., Wilkinson, S.
Brooker, P., & Wilkinson, S. (2010). Construction mediation in Hong Kong SAI ON CHEUNG. In Mediation in the Construction Industry. (pp. 76 - 95). : Routledge
[Chapter]Authored by: Wilkinson, S.
Wilkinson, S. (2010). Construction mediation in New Zealand. In Mediation in the Construction Industry: An International Review. (pp. 108 - 120).
[Chapter]Authored by: Ameer Ali, N., Wilkinson, S.
Le Masurier, J., Wilkinson, S., Zuo, K., & Rotimi, J. (2008). Building resilience by focusing on legal and contractual frameworks for disaster reconstruction. In Hazards and the Built Environment: Attaining Built-in Resilience. (pp. 264 - 281).
[Chapter]Authored by: Rotimi, J., Wilkinson, S.
Wilkinson, S., & Leifer, D. (2007). Human resource management. In Workplace Strategies and Facilities Management. (pp. 146 - 163).
[Chapter]Authored by: Wilkinson, S.
Wilkinson, S. (2006). Women in civil engineering. In Managing Diversity and Equality in Construction: Initiatives and Practice. (pp. 113 - 127).
[Chapter]Authored by: Wilkinson, S.
Wilkinson, S. (2005). The university/industry collaboration process. In Building Education and Research. (pp. 136 - 140).
[Chapter]Authored by: Wilkinson, S.
de Kretser, S., & Wilkinson, S. (2005). Strategies for managing project generated knowledge: A New Zealand case study. In Knowledge Management in the Construction Industry: A Socio-Technical Perspective. (pp. 1 - 17). : IGI Global
[Chapter]Authored by: Wilkinson, S.

Creative Work

Wilkinson, S., & Shestakova, Y. (2006). Collaborative procurement on the rise [Artefact].
[Artefact]Authored by: Tookey, L., Wilkinson, S.

Report

He, P., Shahzad, W., Wilkinson, S., & Domingo, N.(2022). Zero-carbon tenders for public sector projects. (Report No. 192). Wellington, New Zealand
[Technical Report]Authored by: Domingo, N., Shahzad, W., Wilkinson, S.
Chang-Richards, AY., Seville, EP., Wilkinson, S., & Brunsdon, D.(2012). Resourcing issues in past disaster recoveries: Some perspectives. : Resilient Organisations Research Report 2012/07). Auckland, New Zealand …
[Technical Report]Authored by: Wilkinson, S.

Conference

Potangaroa, R., Wilkinson, S., & Mulligan, R.The start of a resilience model for the New Zealand construction industry. AIP Conference Proceedings. 2881 (1)0094-243X.
[Conference]Authored by: Wilkinson, S.
Riyaz, N., Elkharboutly, M., Ali, NANA., & Wilkinson, S.Housing in Kashmir: Traditional Dhajji Dewari housing as a seismic-resistant alternative. AIP Conference Proceedings. 2881 (1)0094-243X.
[Conference]Authored by: Ameer Ali, N., Wilkinson, S.
Auliagisni, W., Wilkinson, S., & Elkharboutly, M.Flood risk management in New Zealand: A case study of the Northland urban community. IOP Conference Series: Earth and Environmental Science. 1101 (2)1755-1307.
[Conference]Authored by: Elkharboutly, M., Wilkinson, S.
Fathianpour, A., Jelodar, MB., Wilkinson, S., & Evans, B.A taxonomy of pedestrian evacuation infrastructure for urban areas; An assessment of resilience towards natural hazards. IOP Conference Series: Earth and Environmental Science. 1101 (2)1755-1307.
[Conference]Authored by: Babaeianjelodar, M., Wilkinson, S.
Bui, TTP., Domingo, N., Macgregor, C., & Wilkinson, S.Zero carbon refurbishment for existing buildings: A literature review. IOP Conference Series: Earth and Environmental Science. 1101 (2)1755-1307.
[Conference]Authored by: Domingo, N., Wilkinson, S.
Asadi, R., Rotimi, JOB., & Wilkinson, S.Classification of rework root causes in the design stage of projects for contract assessment. IOP Conference Series: Earth and Environmental Science. 1101 (4)1755-1307.
[Conference]Authored by: Rotimi, J., Wilkinson, S.
Mirhosseini, SF., Wilkinson, S., & Babaeian Jelodar, M.New Zealand's response to the COVID-19 pandemic and the effects of its governance on the construction industry. IOP Conference Series: Earth and Environmental Science. 1101 (3)1755-1307.
[Conference]Authored by: Babaeianjelodar, M., Wilkinson, S.
Asadi, R., Rotimi, JOB., & Wilkinson, S. (2022). The Assessment of General Conditions of Contract for Addressing Rework Issues in New Zealand Construction Projects, Case Study of NZS3910. In K. Panuwatwanich, C-H. Ko, & J-P. Pantouvakis (Eds.) EPPM 2022 Conference Proceedings. (pp. 73/1 - 73/10). : The 12 International Conference on Engineering, Project and Production Management
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Bui, TTP., Wilkinson, S., Domingo, N., & MacGregor, C.Towards zero carbon building refurbishment: A new conceptual framework for decision support tools. Proceedings of the 37th Annual ARCOM Conference, ARCOM 2021. (pp. 594 - 603).
[Conference]Authored by: Domingo, N., Wilkinson, S.
Asadi, R., Wilkinson, S., & Rotimi, JOB.Contracts evaluation through classified rework root causes in the construction stage of projects. Proceedings of International Structural Engineering and Construction. 7 (2)(pp. CON-21-1-CON-21-6).
[Conference]Authored by: Wilkinson, S.
Nwadike, AN., Wilkinson, S., & Aigwi, IE.Identification of parameters to develop an evidence-based framework to improve building code amendment in New Zealand. Proceedings of the International Conference of Architectural Science Association. (pp. 570 - 579).
[Conference]Authored by: Wilkinson, S.
Phuong Bui, TT., Wilkinson, S., & Domingo, N.Climate change adaptation in New Zealand’s building sector. Proceedings of the International Conference of Architectural Science Association. (pp. 236 - 245).
[Conference]Authored by: Domingo, N., Wilkinson, S.
Asadi, R., Wilkinson, S., & Rotimi, JOB. (2020). Contracts evaluation through classified rework root causes in construction stage of projects. In H. Askarinejad, S. Yazdani, & A. Singh (Eds.) Proceedings of International Structural Engineering and Construction. Vol. 7 (pp. CON-21-1 - CON-21-6). : The Fifth Australasia and South-East Asia Structural Engineering and Construction Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Nwadike, AN., & Wilkinson, S. (2020). Impacts of innovation in performance-based building code. Proceedings of the 2020 New Zealand Society for Earthquake Engineering Annual Technical Conference. Wellington: 2020 New Zealand Society for Earthquake Engineering Annual Technical Conference
[Conference Paper in Published Proceedings]Authored by: Wilkinson, S.
Asadi, R., Wilkinson, S., & Rotimi, J. (2020). Rework Management in Life Cycle of Project: An Outline for Construction Contracts. In WM. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.) Proceedings - New Zealand Built Environment Research Symposium. (pp. 87 - 96). : 6th New Zealand Built Environment Research Symposium 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.Edited by: Rasheed, E., Rotimi, J.
Chang-Richards, A., Seville, E., Wilkinson, S., & Walker, B.Effects of Disasters on Displaced Workers. RESETTLEMENT CHALLENGES FOR DISPLACED POPULATIONS AND REFUGEES. (pp. 185 - 195). 2523-3084.
[Conference]Authored by: Wilkinson, S.
Fasaghandis, HS., & Wilkinson, S. (2019). A review of leadership styles and innovation and their impact on productivity. In X. Zhao, P. Kalutara, & R. Webber (Eds.) PROCEEDINGS OF THE 43RD AUSTRALASIAN UNIVERSITIES BUILDING EDUCATION ASSOCIATION (AUBEA) CONFERENCE 6 – 8 November 2019, Noosa QLD, Australia. (pp. 246 - 254). North Rockhampton: 43rd Australasian University Building Educators Association Conference (AUBEA 2019)
[Conference Paper in Published Proceedings]Authored by: Wilkinson, S.
Zarinkamar, S., Poshdar, M., Quenneville, P., & Wilkinson, S. (2019). Trust to new seismic-proofing technologies: The influential factors. Poster session presented at the meeting of Te Hiranga Rū QuakeCoRE Annual Meeting. Nelson
[Conference Poster]Authored by: Wilkinson, S.
Nwadike, A., Wilkinson, S., & Clifton, C.Comparative insight on building code paradigm shift practice and updates: International perspectives. International Conference on Civil, Structural and Transportation Engineering.
[Conference]Authored by: Wilkinson, S.
Sapeciay, Z., Wilkinson, S., Costello, SB., & Adnan, H.Building Organisational Resilience for the Construction Industy: Strategic Resilience Indicators. IOP Conference Series: Earth and Environmental Science. 385 (1)1755-1307.
[Conference]Authored by: Wilkinson, S.
Fathianpour, A., Babaeianjelodar, M., & Wilkinson, S.Developing Improvements to Multi-Hazard Risk Assessments. . SYDNEY, NSW, AUSTRALIA
[Conference Paper]Authored by: Babaeianjelodar, M., Wilkinson, S.
Asadi, R., Wilkinson, S., & Rotimi, JOB. (2019). Contract document appraisal and rework root causes clasisification in tendering stage of projects. In X. Zhao, P. Kalutara, & R. Webber (Eds.) 43rd AUBEA Australasian Universities Building Education Association Conference. (pp. 86 - 98). : 43rd Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Adafin, J., Rotimi, JOB., Wilkinson, S., & Mbachu, J. (2019). An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. Association of Researchers in Construction Management, ARCOM 2019 - Proceedings of the 35th Annual Conference. (pp. 44 - 53).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Adafin, J., Wilkinson, S., Rotimi, J., Tookey, J., Potangoroa, R., & MacGregor, C. (2019). Why transform the building industry? a case for technological change in New Zealand construction. : CIB World Building Congress 2019 (CIB WBC 2019)
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Zarinkamar, S., Poshdar, M., Quenneville, P., & Wilkinson, S.An Overview of Economic Impact of Resilient Seismic Technologies on Earthquake Insurance in New Zealand. New Zealand Society of Earthquake Engineering (NZSEE) Conference, Auckland, New Zealand.
[Conference]Authored by: Wilkinson, S.
Nwadike, A., Wilkinson, S., & Chang-Richards, A. (2018). Rebuilding Christchurch: Amended Building Codes and their Impacts in NZ. Poster session presented at the meeting of 2018 QuakeCoRE Annual Meeting. Taupo
[Conference Poster]Authored by: Wilkinson, S.
Adafin, J., Wilkinson, S., Rotimi, JOB., Tookey, J., Potangoroa, R., & MacGregor, C. (2018). Why transform the building industry? A case for drivers and barriers to innovation acceleration. In D. Khoa, M. Sutrisna, B. Cooper-Cooke, & OA. Olatunji (Eds.) 42nd AUBEA Conference 2018. Vol. 1 (pp. 130 - 139). : 42nd AUBEA Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Drazba, MC., Yan-Richards, A., & Wilkinson, S.Landslide Hazards in Fiji, managing the risk and not the disaster, a literature review. Procedia Engineering. (pp. 1334 - 1338).
[Conference]Authored by: Wilkinson, S.
Mannakkara, S., Wilkinson, S., Willie, M., & Heather, R.Building Back Better in the Cook Islands: A Focus on the Tourism Sector. Procedia Engineering. (pp. 824 - 831).
[Conference]Authored by: Wilkinson, S.
Aquino, DH., Wilkinson, SJ., Raftery, G., Potangaroa, R., & Chang-Richards, A.Challenges to building housing resilience: The case of Fiji post-cyclone Winston. Procedia Engineering. (pp. 475 - 480).
[Conference]Authored by: Potangaroa, R., Wilkinson, S.
Sweya, LN., Wilkinson, S., & Chang-Richard, A.Understanding Water Systems Resilience Problems in Tanzania. Procedia Engineering. (pp. 488 - 495).
[Conference]Authored by: Wilkinson, S.
Tibay, V., Miller, J., Chang-Richards, A., Egbelakin, T., Seville, E., & Wilkinson, S. (2018). Business resilience: A study of Auckland hospitality sector. Procedia Engineering. Vol. 212 (pp. 1217 - 1224).
[Conference Paper in Published Proceedings]Authored by: Wilkinson, S.
Wilkinson, S., Noktehdan, M., Shahbazpour, M., & Cameron, R.CREATING AN OPPORTUNITY TO INNOVATE DURING DISASTER RECOVERY. Proceeding of the 33rd Annual ARCOM Conference. (pp. 6).
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., Lim, LS., & Jang, HS.ENTERING NEW INTERNATIONAL CONSTRUCTION MARKETS–LESSONS FROM NEW ZEALAND. 13 TH INTERNATIONAL POSTGRADUATE RESEARCH CONFERENCE 2017. (pp. 27).
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., Piri, IS., & Chang-Richards, Y.Developing resilience in subcontracting organisations during disaster recovery. Association of Researchers in Construction Management, ARCOM - 33rd Annual Conference 2017, Proceeding. (pp. 703 - 712).
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., Noktehdan, M., Shahbazpour, M., & Cameron, R.Creating an opportunity to innovate during disaster recovery. Association of Researchers in Construction Management, ARCOM - 33rd Annual Conference 2017, Proceeding. (pp. 208 - 217).
[Conference]Authored by: Wilkinson, S.
Soraya, A., Wilkinson, S., & Babaeian Jelodar, M.Fostering Productivity across New Zealand Construction Industry using Innovation. . Auckland, New Zealand
[Conference Paper]Authored by: Babaeianjelodar, M., Wilkinson, S.
Babaeian Jelodar, M., Yiu, TW., & Wilkinson, S.Dispute Manifestation and Relationship Quality in Practice. . 1943-4162.
[Conference]Authored by: Wilkinson, S.
Ivory, V., Bowie, C., Wilkinson, S., & Chang-Richards, A.Spatio-temporal variation in Christchurch earthquake recovery: Interactions between built, economic and social environments. 6th International Conference on Building Resilience.
[Conference]Authored by: Wilkinson, S.
Sina, D., Wilkinson, S., Chang-Richards, A., & Potangaroa, R.Challenges facing the relocated communities following the 2004 Indian Ocean Tsunami: A study in Indonesia. 6th International Conference on Building Resilience.
[Conference]Authored by: Wilkinson, S.
Aquino, DH., Wilkinson, S., Raftery, G., Chang-Richards, A., & Potangaroa, R.Impact of increased design wind speeds on residential construction costs in the Philippines. 6th International Conference on Building Resilience.
[Conference]Authored by: Wilkinson, S.
Ibrahim, K., Costello, S., Wilkinson, S., & Walker, D.Project Alliancing: The case of road infrastructure projects in New Zealand. Proceedings of the 32nd Annual ARCOM Conference, Manchester. (pp. 5 - 7).
[Conference]Authored by: Wilkinson, S.
Ibrahim, KI., Costello, SB., Wilkinson, S., & Walker, D.Project alliancing: The case of road infrastructure projects in New Zealand. Proceedings of the 32nd Annual ARCOM Conference, ARCOM 2016. (pp. 175 - 184).
[Conference]Authored by: Wilkinson, S.
Adafin, J., Wilkinson, SJ., Rotimi, JOB., & Odeyinka, HA. (2016). Evaluating the budgetary reliability of design stage elemental cost plan in building procurement: a New Zealand study.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Adafin, J., Wilkinson, S., Rotimi, JOB., & Odeyinka, HA. (2016). Methodological approaches to risk assessments during cost plan production. JIC 2016: Joint International Conference.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Egbelakin, TK., Rabel, P., Wilkinson, S., Ingham, J., & Eziaku, R. (2016). How prepared are small businesses for another earthquake disaster in New Zealand?. In A. Saari, & P. Huovinen (Eds.) Proceedings of the CIB World Building Congress 2016. Vol. 3 (pp. 702 - 714). Department of Civil Engineering, Tampere University of Technology; Tampere, Finland,: CIB World Building Congress (WBCIB) 2016
[Conference Paper in Published Proceedings]Authored by: Rasheed, E., Wilkinson, S.
Shahbazpour, M., Noktehdan, M., & Wilkinson, S.Innovation classification and measurement system for construction industry. ISPIM Conference Proceedings. (pp. 1).
[Conference]Authored by: Wilkinson, S.
Chang-Richards, Y., Wilkinson, S., Seville, E., & Brunsdon, D.A systems approach to managing human resources in disaster recovery projects. 5th International Conference on Building Resilience. (pp. 15 - 17).
[Conference]Authored by: Wilkinson, S.
Piri, IS., Chang-Richards, Y., & Wilkinson, S.Skills shortages in the christchurch subcontracting sector. 5th International Conference on Building Resilience.
[Conference]Authored by: Wilkinson, S.
Ibrahim, KI., Costello, SB., & Wilkinson, S.Validation of a model for assessing alliance team integration. Proceedings of the 31st Annual Association of Researchers in Construction Management Conference, ARCOM 2015. (pp. 23 - 32).
[Conference]Authored by: Wilkinson, S.
Adafin, JK., Wilkinson, S., & Rotimi, J. (2015). Accuracy in design stage elemental cost planning: an analysis of New Zealand data. Environmental Design and Management International Conference (EDMIC) 2015.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Piri, IS., Wilkinson, S., & Chang-Richards, AY.Emerging Issues on Resourcing for Christchurch Rebuild. Proceedings of the 4th New Zealand Built Environment Research Symposium (NZBERS). (pp. 2324 - 1829).
[Conference]Authored by: Wilkinson, S.
Baharuddin, H., Wilkinson, S., & Costello, S.Enhancing features of early stakeholder engagement in expressway projects. Proceedings of the 4th New Zealand Built Environment Research Symposium (NZBERS). (pp. 78 - 86).
[Conference]Authored by: Wilkinson, S.
Ibrahim, KI., Costello, SB., & Wilkinson, S.Establishment of Performance Scales for Team Integration Assessment. Australasian Journal of Construction Economics and Building-Conference Series. 2 (2)(pp. 36 - 43). 2200-7679.
[Conference]Authored by: Wilkinson, S.
Davies, K., McMeel, D., & Wilkinson, S.Practice vs. prescription - An examination of the defined roles in the NZ BIM handbook. Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference on Computing in Civil and Building Engineering. (pp. 33 - 40).
[Conference]Authored by: Wilkinson, S.
Jelodar, MB., Yiu, TW., & Wilkinson, S.(2014). A multi-objective decision support system for selecting dispute resolution methods in the construction industry. Paper presented at the meeting of Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference on Computing in Civil and Building Engineering
[Conference Paper]Authored by: Babaeianjelodar, M., Wilkinson, S.
Adafin, J., Wilkinson, S., Rotimi, JOB., & Odeyinka, H. (2014). An exploration of theoretical concepts and methods for assessing risk impacts on the variability between design stage elemental cost plan and tender sum.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Adafin, J., Wilkinson, S., Rotimi, JOB., & Odeyinka, H. (2014). Exploring cost and risk issues in the variability between design stage elemental cost plan and final tender sum. 4th New Zealand Built Environment Research Symposium (NZBERS).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., Costello, SB., & Rotimi, JOB. (2014). Client value in procured construction services: New Zealand participants' perspectives.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Adafin, J., Wilkinson, S., Rotimi, JOB., & Odeyinka, H. (2014). Accuracy in design stage cost estimating through risk-contingency analysis: A theoretical exploration. Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. (pp. 1478 - 1487).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Zuo, K., Wilkinson, S., & Seadon, J.A case study of construction productivity after the 2011 Christchurch earthquake in New Zealand. CIB World Building Congress.
[Conference]Authored by: Wilkinson, S.
Zuo, K., Potangaroa, R., & Wilkinson, S.The barriers to a community contracts approach in post-disaster reconstruction. .
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., Seville, E., Brunsdon, D., & Potangaroa, R.Long-term reconstruction in Christchurch: Learning from its governance structure. .
[Conference]Authored by: Wilkinson, S.
Baharuddin, HEA., Wilkinson, S., & Costello, SB.Evaluating early stakeholder engagement (ESE) as a process for innovation. CIB World Building Congress, Brisbane, Australia.
[Conference]Authored by: Wilkinson, S.
Aliakbarlou, S., Wilkinson, S., & Costello, SB.CREATING A WHOLE LIFE VALUE PATHWAY IN CONSTRUCTION DECISION MAKING. AUBEA 2013.
[Conference]Authored by: Wilkinson, S.
Smith, NE., Costello, SB., & Wilkinson, S.FACTORS CONTRIBUTING TO THE ATTRITION OF WOMEN FROM ENGINEERING: A REVIEW. AUBEA 2013.
[Conference]Authored by: Wilkinson, S.
Hewitt, J., Wilkinson, S., & Potangaroa, R.ERRORS OF COMMISSION: A MODEL OF RECOVERY MANAGEMENT. AUBEA 2013.
[Conference]Authored by: Wilkinson, S.
Sapeciay, Z., Wilkinson, S., Costello, SB., & Sajoudi, MN.POTENTIAL KEY INDICATORS OF ORGANISATIONAL RESILIENCE FOR THE CONSTRUCTION INDUSTRY. AUBEA 2013.
[Conference]Authored by: Wilkinson, S.
Ryan, A., Miller, G., & Wilkinson, S.SUCESSFULLY IMPLEMENTING BUILDING INFORMATION MODELLING IN NEW ZEALAND: MAINTAINING THE RELEVANCE OF CONTRACT FORMS AND PROCURMENT MODELS. AUBEA 2013.
[Conference]Authored by: Wilkinson, S.
Sajoudi, MN., Wilkinson, S., Costello, SB., & Sapeciay, Z.RESILIENT INFRASTRUCTURE PRINCIPAL FEATURES: A. AUBEA 2013.
[Conference]Authored by: Wilkinson, S.
Baharuddin, HEA., Wilkinson, S., & Costello, SB.EARLY STAKEHOLDER ENGAGEMENT (ESE): FACTORS THAT INFLUENCE EFFECTIVE ENGAGEMENT WITH STAKEHOLDERS IN CONSTRUCTION PROJECTS. AUBEA 2013.
[Conference]Authored by: Wilkinson, S.
Ibrahim, CK., Costello, SB., & Wilkinson, S.Overview of key indicators of team integration in construction projects: New Zealand practitioners’ point of view. Proceedings of the World Building Congress. 5 (9)
[Conference]Authored by: Wilkinson, S.
K.I. Ibrahim, SBC.ESTABLISHMENT OF PERFORMANCE SCALES FOR TEAM INTEGRATION ASSESSMENT. AUBEA 2013. (pp. paper - 99).
[Conference]Authored by: Wilkinson, S.
Jelodar, MB., Yiu, TW., & Wilkinson, S.(2013). SOURCES OF CONFLICT AND DISPUTE AS IMPEDIMENTS TO SUSTAINABILITY OF CONSTRUCTION RELATIONSHIPS. Paper presented at the meeting of AUBEA 2013
[Conference Paper]Authored by: Babaeianjelodar, M., Wilkinson, S.
Jelodar, MB., Yiu, TW., & Wilkinson, S.(2013). Stirring sustainable procurement by conceptualizing relationship quality in construction. Paper presented at the meeting of World Building Congress 2013
[Conference Paper]Authored by: Babaeianjelodar, M., Wilkinson, S.
Adafin, J., Wilkinson, S., & Rotimi, JOB. (2013). Risk-contingency fund in the design stage elemental cost planning function: a theoretical exploration. AUBEA 2103.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Chang-Richards, A., Wilkinson, S., Potangaroa, R., & Seville, E.Analysis of resource availability for post-earthquake reconstruction in Christchurch, New Zealand. 8th International Conference of the International Institute for Infrastructure Resilience and Reconstruction (I3R2).
[Conference]Authored by: Wilkinson, S.
EGBELAKI, T., Wilkinson, S., & Nahkies, PB.Impacts of the Property Market on Seismic Retrofit Decisions. 18th Annual Pacific-Rim Real Estate Society Conference, Adelaide, 15-18 January.
[Conference]Authored by: Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E.Analysis of resource availability for post-earthquake reconstruction in Christchurch, New Zealand. The 8th annual International Conference of the International Institute for Infrastructure, Renewal and Reconstruction (IIIRR), 24-26 August.
[Conference]Authored by: Wilkinson, S.
Egbelakin, TK., & Wilkinson, S. (2012). Effect of Stakeholders’ Practices on Seismic Risk Mitigation Decisions. In N. Thurairajah (Ed.) CIB INTERNATIONAL CONFERENCE OF W055, W065, W089, W118, TG76, TG78, TG81 and TG84. Vol. 1 (pp. 144 - 154). : CIB INTERNATIONAL CONFERENCE OF W055, W065, W089, W118, TG76, TG78, TG81 and TG84
[Conference Paper in Published Proceedings]Authored by: Wilkinson, S.
Ibrahim, CKC., Costello, SB., & Wilkinson, S.Key Practice Indicators of Team Integration in Construction Projects: A Review. CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011. (pp. 230 - 235). 2010-4626.
[Conference]Authored by: Wilkinson, S.
Egbelakin, TK., Wilkinson, S., & Nahkies, PB. (2011). Impacts of the property investment market on seismic retrofit decisions. Building an Earthquake-Resilient Society: Proceedings of the Ninth Pacific Conference on Earthquake Engineering. (pp. 14 - 16).
[Conference Paper in Published Proceedings]Authored by: Wilkinson, S.
Ying, JF., & Wilkinson, S.The Difficulties of Implementing Seismic Mitigation Measures–Building Owners’ Decision Making Context. TG62-Special Track 18th CIB World Building Congress May 2010 Salford, United Kingdom. (pp. 106).
[Conference]Authored by: Wilkinson, S.
Zare, MR., & Wilkinson, S.Earthquake effects on metropolitan cities lifelines. 14th International Water Technology Conference, IWTC Cairo, Egypt. (pp. 981 - 993).
[Conference]Authored by: Wilkinson, S.
Beckett, JV., Wilkinson, S., & Potangaroa, R.Post-disaster recovery: Multi-agency leadership and co-ordination. COBRA 2010 - Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors.
[Conference]Authored by: Potangaroa, R., Wilkinson, S.
Zare, MR., Wilkinson, S., & Potangaroa, R.Earthquake vulnerability of wastewater pumping stations in New Zealand. COBRA 2010 - Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors.
[Conference]Authored by: Potangaroa, R., Wilkinson, S.
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E.Resources and capacity: Lessons learned from post-disaster reconstruction resourcing in Indonesia, China and Australia. COBRA 2010 - Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors.
[Conference]Authored by: Potangaroa, R., Wilkinson, S.
Zare, MR., & Wilkinson, S.Resilience of wastewater pipelines in earthquakes. 9th US National and 10th Canadian Conference on Earthquake Engineering 2010, Including Papers from the 4th International Tsunami Symposium. (pp. 6577 - 6586).
[Conference]Authored by: Wilkinson, S.
Rotimi, JOB., & Wilkinson, S. (2010). Scoping disaster recovery considerations in environmental legislation: A New Zealand perspective. COBRA 2010 - Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Ali, NANA., & Wilkinson, S. (2010). Modernising Construction Contracts Drafting–A Plea for Good Sense. W113-Special Track 18th CIB World Building Congress May 2010 Salford, United Kingdom. (pp. 323).
[Conference Paper in Published Proceedings]Authored by: Ameer Ali, N., Wilkinson, S.
Scofield, R., Wilkinson, S., Potangaroa, R., & Rotimi, F.Driving innovative offsite construction techniques in New Zealand. Global Innovation in Construction Conference Loughborough University, UK.
[Conference]Authored by: Wilkinson, S.
Chang, Y., Wilkinson, S., Seville, E., & Potangaroa, R.Capacity empowerment and building: Integrated recovery management framework in China. WIT Transactions on the Built Environment. (pp. 309 - 319). 1743-3509.
[Conference]Authored by: Potangaroa, R., Wilkinson, S.
Zare, MR., & Wilkinson, S.Waste water system vulnerability to earthquake. Proceedings of the 1st International Postgraduate Conference on Infrastructure and Environment, IPCIE 2009. (pp. 89 - 97).
[Conference]Authored by: Wilkinson, S.
Zuo, K., Potangaroa, R., & Wilkinson, S.Supply chain analysis and the sustainability of postdisaster construction: The Boxing Day Tsunami reconstruction experience in Aceh, Indonesia. International Workshop on Post-Earthquake Reconstruction and Safe Buildings.
[Conference]Authored by: Wilkinson, S.
Zuo, K., & Wilkinson, S.Supply chain and material procurement for post disaster construction: the Boxing Day Tsunami reconstruction experience in Aceh, Indonesia. CIB W89 International Conference on Building Education and Research BEAR 2008.
[Conference]Authored by: Wilkinson, S.
Rotimi, JO., Wilkinson, S., & Myburgh, D. (2008). Towards a national policy framework for post-disaster reconstruction in New Zealand. Proceedings of the Information and Research for Reconstruction (i-Rec) Fourth International Conference on ‘Post-disaster reconstruction: Building resilience-achieving effective post-disaster reconstruction.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Egbelakin, T., & Wilkinson, S. (2008). Factors affecting motivation for improved seismic retrofit implementation.
[Conference Paper in Published Proceedings]Authored by: Wilkinson, S.
Hewitt, J., Potangaroa, R., & Wilkinson, S.The role of Urban Change Hierarchies in the Planning of Disaster Responses. Proceedings of the 7th International Postgraduate Research Conference in the Built and Human Environment, University of Salford, Manchester, UK. (pp. 222 - 233).
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., Zuo, K., Le Masurier, J., & Van der Zon, J.A Tale Of Two Floods: Reconstruction After Flood Damage In New Zealand. Proceedings, CIB World Congress: Construction for Development.
[Conference]Authored by: Wilkinson, S.
Le Masurier, J., Rotimi, JO., & Wilkinson, S.Regulatory frameworks for post-disaster reconstruction: Improving resilience in the process. Proceedings, CIB World Congress: Construction for Development, Cape Town. (pp. 14 - 17).
[Conference]Authored by: Wilkinson, S.
Organisations, R.Barriers to post-disaster reconstruction. Report on Workshop held.
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., & Ying, F.Life cycle costing decisions for retrofitting earthquake vulnerable buildings. Eighth US National Conference on Earthquake Engineering, San Francisco, CA. (pp. 8).
[Conference]Authored by: Wilkinson, S.
Zuo, K., Wilkinson, S., Masurier, JL., & Zon, JVD.Reconstruction procurement systems: the 2005 Matata flood reconstruction experience. I-Rec 2006 International Conference on Post-Disaster Reconstruction:“Meeting Stakeholder Interests”, Florence.
[Conference]Authored by: Wilkinson, S.
Masurier, JL., Wilkinson, S., & Shestakova, Y.An analysis of the alliancing procurement method for reconstruction following an earthquake. Proceedings of the 8th US national conference on earthquake engineering. (pp. 18 - 22).
[Conference]Authored by: Wilkinson, S.
Masurier, JL., Wilkinson, S., & Shestakova, Y.An analysis of the alliancing procurement method for reconstruction following an earthquake. 8th US National Conference on Earthquake Engineering 2006. (pp. 6144 - 6151).
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., & Ying, FJ.Life cycle costing decisions for retrofitting earthquake vulnerable buildings. 8th US National Conference on Earthquake Engineering 2006. (pp. 4460 - 4467).
[Conference]Authored by: Wilkinson, S.
Rotimi, JOB., Le Masurier, J., & Wilkinson, S. (2006). The regulatory framework for effective post-disaster reconstruction in New Zealand.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Le Masurier, J., Rotimi, JOB., & Wilkinson, S. (2006). A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand. Association of Researchers in Construction Management, ARCOM 2006 - Procs 22nd Annual ARCOM Conference. Vol. 1 (pp. 523 - 530).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Ying, FJ., & Wilkinson, S.Improving time performance for asset owning clients. Queensland University of Technology Research Week International Conference, QUT Research Week 2005 - Conference Proceedings.
[Conference]Authored by: Wilkinson, S., Ying, J.
Francis, V., Kestle, L., Scofield, R., & Wilkinson, S.Women academics in the built environmentperspectives from Australia and New Zealand. AUBEA 2004 29th Annual Conference'Higher Education Shaping the Built Environment'. The University of Newcastle, Newcastle Australia.
[Conference]Authored by: Wilkinson, S.
Hewitt, J., & Wilkinson, S.The Impact of a Dominant Culture on the Sustainability of the Urban Environment. AUBEA conference, Queenstown, New Zealand.
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., & Scofield, R.A sequel to integrating architecture and engineering education: A case study of a new management course. Proc., 3rd and 4th Int. Electronic AUBEA Conf. (pp. 147 - 151).
[Conference]Authored by: Wilkinson, S.
Wilkinson, S., & Scofield, R.Integrating architecture and engineering education: A case study of a new management course. Proc., 3rd and 4th Int. Electronic AUBEA Conf. (pp. 37 - 40).
[Conference]Authored by: Wilkinson, S.
Wilkinson, S.The changing nature of quantity surveying practices in New Zealand. Proceedings of the construction and building research conference of the Royal Institute of Chartered Surveyor. Retrieved from: http://www. rics. org/site/download_feed. aspx.
[Conference]Authored by: Wilkinson, S.
Wilkinson, SJ.Women, Computers, and the Construction Industry. Ninth International Conference of Women Engineers and Scientists: Communication Demographics: University of Warwick, 14-20 July 1991. (pp. 157).
[Conference]Authored by: Wilkinson, S.
Wilkinson, S.Career paths and childcare: Employer's attitude towards women in construction. Proceedings from the Women in Construction Conference.
[Conference]Authored by: Wilkinson, S.
Ali, NANA., & Wilkinson, S.RETHINKING OR TINKERING CONTRACT MANAGEMENT?.
[Conference Paper in Published Proceedings]Authored by: Ameer Ali, N., Wilkinson, S.

Other

Mannakkara, S., Wilkinson, S., & Potangaroa, R. (2018). Resilient Post Disaster Recovery Through Building Back Better. Routledge
[Other]Authored by: Wilkinson, S.
Chang-Richards, A., Wilkinson, SJ., Seville, E., & Brunsdon, D. (2016). Capacity and capability development of Canterbury subcontracting businesses: Features, motivating factors and obstacles. Resilient Organisations
[Other]Authored by: Wilkinson, S.
Chang-Richards, A., Wilkinson, SJ., Seville, E., & Brunsdon, D. (2016). Trends in resourcing and employment practice of Canterbury construction organisations. Resilient Organisations
[Other]Authored by: Wilkinson, S.
Chang-Richards, A., Wilkinson, SJ., Seville, E., & Brunsdon, D. (2015). Resourcing the Canterbury rebuild: Emerging issues facing subcontracting businesses. Resilient Organisations
[Other]Authored by: Wilkinson, S.
Scott Miles, Dana Brechwald, Rachel Davidson, Katalin Demeter, David Johnston, Stefano Pampanin, Suzanne Wilkinson, . (2014). BUILDING BACK BETTER Case Study of the 2010-2011 Canterbury, New Zealand Earthquake Sequence.
[Other]Authored by: Wilkinson, S.
Mannakkara, S., & Wilkinson, S. (2014). Building Back Better in Japan–Lessons from the Indian Ocean Tsunami experience in Sri Lanka.
[Other]Authored by: Wilkinson, S.
Wilkinson, S., Rotimi, JOB., & Mannakarra, S. (2014). Legislation changes following earthquake disasters. (pp. 1 - 10).
[Other]Authored by: Rotimi, J., Wilkinson, S.
Wilinson, S., Suzanne, W., & Scofield, R. (2010). Management for the New Zealand construction industry. Pearson Education New Zealand
[Other]Authored by: Wilkinson, S.
Scofield, R., Potangaroa, R., & Bell, P. (2009). Offsite unplugged: the potential for offsite production in New Zealand.
[Other]Authored by: Wilkinson, S.
Seville, E., Brunsdon, D., Dantas, A., Le Masurier, J., Wilkinson, S., & Vargo, J. (2006). Building organizational resilience, Resilient Organizations Programme, New Zealand.
[Other]Authored by: Wilkinson, S.
Wilkinson, S. (1993). Entry to employment: choices made by qualified women civil engineers leaving higher education. Oxford Brookes University
[Other]Authored by: Wilkinson, S.

Consultancy and Languages

Consultancy

  • 2016-2019 - Auckland Council
    Resilience and Recovery Adviser
  • 2017-2020 - Hunter Water
    Expert Adviser to the Hunter Water Corporation Leadership Team on Resilience and Innovation

Teaching and Supervision

Teaching Statement

Current Supervision includes 15 PhD students

Summary of Doctoral Supervision

Position Current Completed
Main Supervisor 13 5
Co-supervisor 7 0

Current Doctoral Supervision

Main Supervisor of:

  • Kristel Aquino - Doctor of Philosophy
    RESyst: A Framework for Resilient Energy Systems in Aotearoa New Zealand
  • Fatemeh Asghari Kaleshani - Doctor of Philosophy
    A tool for Assessing the Risks of Hydrological Hazards in Indigenous Communities in the Context of Climate Change
  • Sateesh Kumar Pisini - Doctor of Philosophy
    A Comprehensive Circular Framework for Achieving Net Zero Design in Flexible Pavements and High-Rise Buildings through Life Cycle Assessment and Evaluation of Embodied Carbon.
  • Mitansha Mitansha - Doctor of Philosophy
    Increasing Individual Resilience Strategies for Construction Industry Employees
  • Naomaan Naomaan Riyaz - Doctor of Philosophy
    Disaster management and recovery in Kashmir: Analysis of readiness and response after 2005 Kashmir earthquake
  • Alireza Shamloo - Doctor of Philosophy
    Developing a model for post-disaster housing in Iran based on recent construction technologies
  • Anna-Kay Spaulding Agbenyegah Spaulding - Doctor of Philosophy
    Post-disaster recovery from high weather event in Auckland
  • Hemn Ahmed - Doctor of Philosophy
    The effectiveness of linear/nonlinear viscous damper subsystem stiffness on structural responses in buildings subjected to earthquakes.
  • Zhe Gong - Doctor of Philosophy
    Sustainable construction: Carbon sequestration in buildings and infrastructure
  • Faezeh Mirhosseini - Doctor of Philosophy
    Impacts of COVID-19 on the New Zealand Construction ProjectsCase Study: Massey University Innovation Center
  • Widi Auliagisni Auliagisni - Doctor of Philosophy
    Building resilience from flooding in Northland, New Zealand
  • Hossein Sadeghzadeh Fasaghandis - Doctor of Philosophy
    Measuring Innovation in New Zealand Construction Organisations: Developing a Measurement Tool for New Zealand
  • Azin Fathianpour - Doctor of Philosophy
    Enhancing Multi-Hazard Resilience to Tsunami through Evacuation Simulation: A Case Study of Napier City

Co-supervisor of:

  • Ala' Abuorabi Aladwan - Doctor of Philosophy
    Impact of Industry 4.0 Technologies on Productivity Improvement in the New Zealand Construction Industry
  • Wajhat Ali - Doctor of Philosophy
    AI-Enhanced Decision Support System for Real Estate Management in New Zealand
  • Francis Hubbard - Doctor of Philosophy
    Identifying indicators of success in the 'Build Back Better' framework in international aid assisted recovery.
  • Jaleh (Roja) Sadeghi - Doctor of Philosophy
    Construction Sector Capacity and Capability Evaluation: Case in New Zealand
  • Noushin Naraghiaraghi - Doctor of Philosophy
    Simulating and visualising indoor seismic damage using digital technologies
  • Kambiz Radman - Doctor of Philosophy
    Real-Time Delay Management System: A Combined Automated Data Fusion Model
  • Vineet Arya - Doctor of Philosophy
    A New Normal for Classrooms of Primary School – Post -Covid-19: A Case Study New Zealand.

Completed Doctoral Supervision

Main Supervisor of:

  • 2023 - Thi Phuong Thao Bui - Doctor of Philosophy
    TOWARDS ZERO CARBON REFURBISHMENT OF EXISTING BUILDINGS IN AOTEAROA NEW ZEALAND: A DECISION SUPPORT FRAMEWORK
  • 2023 - Witharanage Rodrigo - Doctor of Philosophy
    Planning in the front end of Flagship Projects post-disaster: A Canterbury earthquake study
  • 2022 - Ramin Asadi - Doctor of Philosophy
    Rework Management in construction contracts: An assessment of NZS3910:2013 provisions
  • 2022 - Marcel Frei - Doctor of Philosophy
    A Quantitative Situation Analysis Model for Strategic Planning in Quantity Surveying Firms
  • 2021 - Amarachukwu Nwadike - Doctor of Philosophy
    The impacts of building code amendments in New Zealand

Media and Links

Media

  • 14 Dec 2020 - Radio
    Carbon neutral public sector achievable by 2025?
    Is a carbon neutral public sector achievable by 2025? From Nine To Noon, 9:08 am on 14 December 2020 The public sector must go carbon neutral by 2025 - but there are concerns an overburdened construct
  • 01 Oct 2020 - Magazine
    Asking the big questions - BUILD, BRANZ
    Suzanne Wilkinson, Professor of Construction Management and Associate Dean Research at Massey University, says COVID-19, as with other disasters, demands smart thinking about how the industry organise
  • 01 Feb 2021 - Magazine
    Refurbishing for net-zero carbon
    Buildings have a major role to play in climate change mitigation. Research is under way to develop a tool to support zero-carbon decision making in the refurbishment process for buildings.
  • 01 Dec 2020 - Magazine
    Solving capacity and capability problems
    1 December 2020, Build 181 A system that matches construction needs and the sector’s ability to deliver should help the industry avoid old problems of underperformance at a time when a major pipeline

Other Links