Journal
Weerasinghe, AS., Ramachandra, T., & Rotimi, JOB. (2021). Comparative Life-Cycle Cost (LCC) study of Green and Traditional Industrial
Buildings in Sri Lanka.
Energy and Buildings. , 1-12
[Journal article]Authored by: Rotimi, J.Read Online:

Oyewobi, LO., Olorunyomi, OS., Jimoh, RA., & Rotimi, JOB. (2020). Oyewobi, Luqman Oyekunle; Olorunyomi, Olufemi Seth; Jimoh, Richard Ajayi ; Rotimi, James Olabode Bamidele
Impact of Social Media Usage on Performance of Construction Businesses (CBs) in Abuja-Nigeria.
Journal of Financial Management of Property and Construction.
[Journal article]Authored by: Rotimi, J.
Ramanayaka, CDE., Olatunji, OA., & Rotimi, JO. (2020). Critical success factors of strategy-led planning of high-profile projects.
International Journal of Construction Management.
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Oyewobi, LO., Windapo, A., Rotimi, JOB., & Jimoh, R. (2020). Analysis of the South African construction industry business environment.
Journal of Facilities Management. 18(4), 393-416
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Weerasinghe, AS., Ramachandra, T., & Rotimi, JOB. (2020). Towards sustainable commercial buildings: an analysis of operation and maintenance (O&M) costs in Sri Lanka.
Smart and Sustainable Built Environment.
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

view more...
Adafin, J., Rotimi, JOB., & Wilkinson, S. (2020). An evaluation of risk factors impacting project budget performance in New Zealand.
Journal of Engineering, Design and Technology.
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read article at Massey Research Online:

Oyewobi, LO., Windapo, AO., Jimoh, RA., & Rotimi, JOB. (2019). Performance, resources and capabilities of construction organisations: The mediating role of competitive strategies.
International Journal of Construction Supply Chain Management. 9(1), 35-39
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Witton, F., Rasheed, EO., & Rotimi, JOB. (2019). Does leadership style differ between a post-disaster and non-disaster response project? A study of three major projects in New Zealand.
Buildings. 9(9)
[Journal article]Authored by: Rasheed, E., Rotimi, J.Read article at Massey Research Online:

Read Online:

Read Abstract:

Aigwi, IE., Egbelakin, T., Ingham, J., Phipps, R., Rotimi, J., & Filippova, O. (2019). A performance-based framework to prioritise underutilised historical buildings for adaptive reuse interventions in New Zealand.
Sustainable Cities and Society. 48
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Francis, M., Ramachandra, T., & Rotimi, JOB. (2016). Strategies to minimise the effects of delayed payments.
Proceedings of the institution of Civil Engineers. Management, Procurement and Law. 169(5), 199-207 Retrieved from https://www.icevirtuallibrary.com/doi/10.1680/jmapl.15.00038
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Zaeri, F., Rotimi, JOB., Hosseini, MR., & Cox, J. (2017). Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry.
Construction Innovation. 17(3), 324-339
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Adafin, J., Rotimi, JOB., & Wilkinson, S. (2020). Risk impact assessments in project budget development: quantity surveyors' perspectives.
International Journal of Construction Management. 20(1), 13-28
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read Online:

Read Abstract:

Oyewobi, LO., Windapo, AO., & Rotimi, JOB. (2017). Determinants of construction organisational performance: A partial least square-path analytic method.
Journal of Financial Management of Property and Construction. 22(1), 37-61
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Oyewobi, LO., Windapo, AO., Rotimi, JOB., & Jimoh, RA. (2019). Determining strategic clusters and performance of construction organizations in South Africa.
International Journal of Construction Management. 19(1), 46-56
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Jimoh, R., Adaji, A., Rotimi, J., & Oyewobi, L. (2017). Post disaster housing reconstruction (PDHR) in Ibaji and Lokoja, Kogi State-Nigeria.
Malaysian Journal of Civil Engineering. 29(2), 194-215 Retrieved from http://civil.utm.my/mjce/vol-29-issue-2-2017/
[Journal article]Authored by: Rotimi, J.
Oyewobi, LO., Windapo, A., & Rotimi, JOB. (2016). Relationship between decision-making style, competitive strategies and organisational performance among construction organisations.
Journal of Engineering, Design and Technology. 14(4), 713-738
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Adafin, J., Rotimi, JOB., & Wilkinson, S. (2016). Risk impact assessments in project budget development: architects’ perspectives.
Architectural Engineering and Design Management. 12(3), 189-204
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read Online:

Read Abstract:

GhaffarianHoseini, A., Tookey, J., GhaffarianHoseini, A., Naismith, N., & Bamidele Rotimi, JO. (2016). Integrating alternative technologies to improve built environment sustainability in Africa: Nexus of energy and water.
Smart and Sustainable Built Environment. 5(3), 193-211
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Oyewobi, LO., Windapo, AO., Rotimi, JOB., & Jimoh, RA. (2016). Relationship between competitive strategy and construction organisation performance: The moderating role of organisational characteristics.
Management Decision. 54(9), 2340-2366
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Rotimi, JOB., Lambers, R., & Zaeri, F. (2016). Trust and inter organisational interactions for managing conflicts in blended teams.
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 8(1), C4515004-1-C4515004-6 Retrieved from http://ascelibrary.org/doi/abs/10.1061/(ASCE)LA.1943-4170.0000174
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Adafin, J., Rotimi, JOB., & Wilkinson, S. (2016). Determining Significant Risks in the Variability between Design-Stage Elemental Cost Plan and Final Tender Sum.
Journal of Management in Engineering. 32(6)
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read Online:

Read Abstract:

Oyewobi, LO., Windapo, AO., & Rotimi, JOB. (2015). An empirical analysis of construction organisations’ competitive strategies and performance.
Built Environment Project and Asset Management. 5(4), 417-431 Retrieved from http://www.emeraldinsight.com/doi/pdfplus/10.1108/BEPAM-10-2013-0045
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Rajeh, M., Tookey, J., & Rotimi, JOB. (2015). Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology.
Engineering, Construction and Architectural Management. 22(2), 242-267 Retrieved from http://dx.doi.org/10.1108/ECAM-10-2014-0130
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Ramachandra, T., & Rotimi, JO. (2015). Mitigating payment problems in the construction industry through analysis of construction payment disputes.
The Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 7(1), A4514005-1-A4514005-8 Retrieved from http://ascelibrary.org/doi/abs/10.1061/(ASCE)LA.1943-4170.0000156
[Journal article]Authored by: Rotimi, J.
Ramachandra, T., & Rotimi, JO. (2015). The Construction Contracts Act and its implications for payment defaults in New Zealand.
Journal of Legal Affairs and Dispute Resolution (ASCE). 8(1), C4515006-1-C4515006-7 Retrieved from http://ascelibrary.org/doi/abs/10.1061/(ASCE)LA.1943-4170.0000179
[Journal article]Authored by: Rotimi, J.Read Online:

Adafin, J., Rotimi, JOB., & Wilkinson, S. (2015). Why do the design stage elemental cost plan and final tender sum differ in new zealand?.
Journal of Financial Management of Property and Construction. 20(2), 116-131
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

Rotimi, FE., Tookey, J., & Rotimi, JO. (2015). Evaluating defect reporting in new residential buildings in New Zealand.
Buildings. 5(1), 39-55
[Journal article]Authored by: Rotimi, J.Read article at Massey Research Online:

Read Online:

Read Abstract:

Ramachandra, T., & Rotimi, JOB. (2015). Causes of payment problems in the New Zealand construction industry.
Construction Economics and Building. 15(1), 43-55
[Journal article]Authored by: Rotimi, J.Read article at Massey Research Online:

Read Online:

Read Abstract:

Rotimi, JOB., & Ramanayaka, CDD. (2015). Analysis of the influence of a strategy-led planning approach on successful construction project implementation.
Construction Economics and Building. 15(2), 13-30
[Journal article]Authored by: Rotimi, J.Read article at Massey Research Online:

Read Online:

Read Abstract:

Rotimi, FE., Tookey, JE., & Rotimi, JOB. (2015). Home owners and developers relationships: exploring the cordiality factor.
Structural Survey. 33(3), 278-292
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Rajeh, MA., Tookey, JE., & Rotimi, JOB. (2015). Developing a procurement path determination chart SEM-based approach.
Construction Management and Economics. 33(11), 921-941
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Egbelakin, T., Wilkinson, S., Potangaroa, R., & Rotimi, J. (2015). Stakeholders’ practices: a challenge to earthquake risk mitigation decisions.
International Journal of Strategic Property Management. 19(4), 395-408
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read Online:

Read Abstract:

Oyewobi, LO., Windapo, AO., & Rotimi, JOB. (2015). Measuring strategic performance in construction companies: a proposed integrated model.
Journal of Facilities Management. 13(2), 109-132
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Rotimi, JOB., & Ramanayaka, CDD. (2015). Reflective practice and technical rationality in construction project planning.
Civil Engineering and Environmental Systems. 32(4), 301-315
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Rotimi, JOB., & Kiptala, RK. (2014). Adequacy of ventilations systems: Perspectives of designers and occupants of office buildings in Nairobi, Kenya.
African Journal of Environmental Science and Technology. 8(12), 707-715 Retrieved from http://www.academicjournals.org/article/article1418893035_Rotimi%20and%20Kiptala.pdf
[Journal article]Authored by: Rotimi, J.Read article at Massey Research Online:

Read Online:

Rajeh, MA., Tookey, J., & Rotimi, J. (2014). Procurement selection model: Development of a conceptual model based on transaction costs.
Australasian Journal of Construction Economics and Building - Conference Series. 2(2), 56-63 Retrieved from http://epress.lib.uts.edu.au/journals/index.php/AJCEB-Conference-Series/issue/view/308
[Journal article]Authored by: Rotimi, J.Read article at Massey Research Online:

Zaeri, F., & Rotimi, JOB. (2014). An ACD diagram developed for simulating a bridge construction operation.
International Journal of Construction Supply Chain Management. 4(2), 34-50 Retrieved from http://www.ijcscm.com/sites/default/files/issue/nid-40340/fzaeri_1426209359.pdf
[Journal article]Authored by: Rotimi, J.Read article at Massey Research Online:

Read Online:

Vilasini, N., Neitzert, T., & Rotimi, J. (2014). Developing and evaluating a framework for process improvement in an alliance project: A New Zealand case study.
Construction Management and Economics. 32(6), 625-640
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Rotimi, JOB., & Wilkinson, S. (2014). Improving environmental management legislation to facilitate post-disaster reconstruction.
International Journal of Disaster Resilience in the Built Environment. 5(1), 23-37
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

Ramachandra, T., Rotimi, JOB., & Rameezdeen, R. (2013). Direction of the causal relationship between construction and the national economy of Sri Lanka.
Journal of Construction in Developing Countries. 18(2), 49-63
[Journal article]Authored by: Rotimi, J.Read Abstract:

Vilasini, N., Neitzert, T., Rotimi, JOB., & Windapo, AO. (2012). A framework for sub-contractor integration in alliance contracts.
International Journal of Construction Supply Chain Management. 2(1), 17-33 Retrieved from http://www.ijcscm.com/sites/default/files/issue/nid-143/nimeshav_1334894016.pdf
[Journal article]Authored by: Rotimi, J.Read article at Massey Research Online:

Windapo, AO., & Rotimi, JO. (2012). Contemporary issues in building collapse and its implications for sustainable development.
Buildings. 2(3), 283-299
[Journal article]Authored by: Rotimi, J.Read article at Massey Research Online:

Read Online:

Read Abstract:

Ramachandra, T., & Olabode Bamidele Rotimi, J. (2012). Liquidation and its effects on construction trade creditors in New Zealand.
Journal of Financial Management of Property and Construction. 17(2), 166-175
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

Mouchi, G., Rotimi, JO., & Ramachandra, T. (2011). The skill sets required for managing complex construction projects.
Business Education and Accreditation. 3(1), 89-100
[Journal article]Authored by: Rotimi, J.
Vilasini, N., Neitzert, TR., & Rotimi, JO. (2011). Correlation between construction procurement methods and lean principles.
International Journal of Construction Management. 11(4), 65-78
[Journal article]Authored by: Rotimi, J.Read Abstract:

Ramachandra, T., & Rotimi, JO. (2011). The nature of payment problems in the New Zealand construction industry.
Australasian Journal of Construction Economics and Building. 11(2), 22-33
[Journal article]Authored by: Rotimi, J.Read Abstract:

Rotimi, JO., Wilkinson, S., Zuo, K., & Myburgh, D. (2009). Legislation for effective post-disaster reconstruction.
International Journal of Strategic Property Management. 13(2), 143-152
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

Zuo, K., Potangaroa, R., Wilkinson, S., & Rotimi, JOB. (2009). A project management prospective in achieving a sustainable supply chain for timber procurement in Banda Aceh, Indonesia.
International Journal of Managing Projects in Business. 2(3), 386-400
[Journal article]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

Jimoh, RA., Kehinde, JO., Mosaku, TO., & Rotimi, JOB. (2007). Constraints in housing development and implementation: Lessons from Nigeria.
NICMAR, Journal of Construction Management. XXIII(III), 35-45
[Journal article]Authored by: Rotimi, J.
Gandu, YJ., Okoli, OG., & Rotimi, JOB. (2007). The reliability of client's estimate during contractor selection.
Construction Focus, Nigerian Journal of Construction. 1(1), 75-81
[Journal article]Authored by: Rotimi, J.
Kehinde, JO., Rotimi, JOB., & Jimoh, RA. (2003). An appraisal of housing policy implementation on Nigeria: A case study.
NICMAR Journal of Construction Management. XVIII(III), 41-52
[Journal article]Authored by: Rotimi, J.
Garba, MM., Rotimi, JO., & Joel, OS. (2003). Appraisal of concrete mix design application in construction firms in Nigeria.
ATBU Journal of Environmental Technology. 2(1), 25-29
[Journal article]Authored by: Rotimi, J.
Kuroshi, PA., Rotimi, JOB., & Sikora, ZJ. (2002). Build-Operate-Transfer (BOT) and factoring method: An alternative financing scheme for public sector construction projects.
Spectrum Journal. 9(1), 120-128
[Journal article]Authored by: Rotimi, J.
Garba, MM., Rotimi, JOB., & Balarabe, MS. (2002). Effect of mechanically and manually crushed aggregates on concrete strength.
ATBU Journal of Environmental Technology. 1(1), 79-82
[Journal article]Authored by: Rotimi, J.
Oyewobi, LO., Windapo, AO., & Rotimi, JOB. (2016). Environment, competitive strategy, and organizational characteristics: A path analytic model of construction organizations’ performance in South Africa.
Canadian Journal of Administrative Sciences. 33(3), 213-226
[Journal article]Authored by: Rotimi, J.Read Online:

Read Abstract:

view less...
Conference
Weerasinghe, A., Rasheed, EO., & Rotimi, JOB. (2020). Occupant Energy Behaviours – A Review of Indoor Environmental Quality (IEQ) and Influential factors.
The 54th International Conference of the Architectural Science Association (ANZAScA) 2020. : The 54th International Conference of the Architectural Science Association (ANZAScA) 2020
[Conference Paper in Published Proceedings]Authored by: Rasheed, E., Rotimi, J.
Qadir, J., Moore, D., Ghaffarian Hoseini, A., George, CT., & Rotimi, JO. (2020). To understand the systemic and contextual factors to improve the strategic decision making of regenerative projects.
The 54th International Conference of the Architectural Science Association (ANZAScA) 2020. : The 54th International Conference of the Architectural Science Association (ANZAScA) 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Qadir, J., Moore, D., Ghaffarian Hoseini, A., George, CT., & Rotimi, JO. (2020). To improve the strategic decision making for effective governance of public-spend regenerative projects.
The 54th International Conference of the Architectural Science Association (ANZAScA) 2020. : The 54th International Conference of the Architectural Science Association (ANZAScA) 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Weerasinghe, A., Ramachandra, T., & Rotimi, JOB. (2020). Application of green retrofit technology: A systematic review. In H. Askarinejad, S. Yazdani, & A. SIngh (Eds.)
Proceedings of International Structural Engineering and Construction. Vol. 7 (pp. SUS-10-1 - SUS-10-6). : The Fifth Australasia and South-East Asia Structural Engineering and Construction Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Online:

Read Abstract:

Asadi, R., Wilkinson, S., & Rotimi, JOB. (2020). Contracts evaluation through classified rework root causes in construction stage of projects. In H. Askarinejad, S. Yazdani, & A. Singh (Eds.)
Proceedings of International Structural Engineering and Construction. Vol. 7 (pp. CON-21-1 - CON-21-6). : The Fifth Australasia and South-East Asia Structural Engineering and Construction Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Online:

Read Abstract:

view more...
Alqudah, H., Poshdar, M., Rotimi, JOB., & Tookey, J. (2020). Performance Differentialsin SMEs: The New Zealand Construction Industry. In WM. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.)
Proceedings - New Zealand Built Environment Research Symposium. (pp. 189 - 195). : 6th New Zealand Built Environment Research Symposium 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Edited by: Rotimi, J., Shahzad, W.
Wahid, I., Rotimi, JOB., Shahzad, W., & Rasheed, N. (2020). Nature of New Zealand Construction Industry: An Exploratory Analysis of Performance Hindering Challenges. In WM. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.)
Proceedings - NewZealand Built Environment Research Symposium. (pp. 181 - 188). : 6th New Zelanad Built Environment Research Symposium
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Shahzad, W.Edited by: Rotimi, J., Shahzad, W.
Weerasinghe, AS., Rasheed, E., & Rotimi, JOB. (2020). Energy Retrofitting: Value Case for Costs and Savings. In WM. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.)
Proceedings - New Zealand Built Environment Symposium. (pp. 138 - 146). : 6th New Zealand Built Environment Research Symposium 2020
[Conference Paper in Published Proceedings]Authored by: Rasheed, E., Rotimi, J.Edited by: Rasheed, E., Rotimi, J., Shahzad, W.
Asadi, R., Wilkinson, S., & Rotimi, J. (2020). Rework Management in Life Cycle of Project: An Outline for Construction Contracts. In WM. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.)
Proceedings - New Zealand Built Environment Research Symposium. (pp. 87 - 96). : 6th New Zealand Built Environment Research Symposium 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.Edited by: Rotimi, J., Shahzad, W.
Bakhtiarizadeh, E., Shahzad, W., & Rotimi, J. (2020). Applying Secure Information-based Mechanism for Prefabrication Supply Chain Integration: A Review. In WM. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.)
Proceedings - New Zealand Built Environment Research Symposium. (pp. 71 - 78). : 6th New Zealand Built Environment Research Symposium 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Shahzad, W.Edited by: Rotimi, J., Shahzad, W.
Chao, Q., & Rotimi, JOB. (2020). Addressing Resource Shortages using International Joint Ventures in New Zealand: A Case Study. In WM. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.)
Proceedings - New Zealand Built Environment Research Symposium. (pp. 61 - 70). : 6th New Zealand Built Environment Research Symposium 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Edited by: Rotimi, J.
Likita, AJ., Jelodar, MB., & Rotimi, J. (2020). Lean Philosophy and BIM for Productivity in New Zealand Construction. In WM. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.)
Proceedings - New Zealand Built Environment Research Symposium. (pp. 55 - 60). : 6th New Zealand Built Environment Research Symposium 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Edited by: Rotimi, J.
Rasheed, N., Wahid, I., Shahzad, W., & Rotimi, JOB. (2020). Understanding the Factors Critical to Success of PPPs in New Zealand: Public and Private Sector Standpoint. In W. Shahzad, EO. Rasheed, & JOB. Rotimi (Eds.)
Proceedings - New Zealand Built Environment Research Symposium. (pp. 13 - 20). : 6th New Zealand Built Environment Research Symposium 2020
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Shahzad, W.Edited by: Rotimi, J., Shahzad, W.Read article at Massey Research Online:

Rotimi, JOB., Wahid, I., & Shahzad, W. (2019). Factors limiting performance of the construction industry: A New Zealand perspective. In X. Zhao, P. Kalutara, & R. Webber (Eds.)
43rd AUBEA Australasian Universities Building Education Association Conference. (pp. 629 - 637). : 43rd Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Shahzad, W.
Rasheed, N., Tejano Jr., CA., Shahzad, W., & Rotimi, JOB. (2019). Critical success factors of Public Private Partnerships (PPPs) in New Zealand. In X. Zhao, P. Kalutara, & R. Webber (Eds.)
43rd AUBEA Australasian Universities Building Education Association Conference. (pp. 223 - 232). : 43rd Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Shahzad, W.
Bakhtiazadeh, E., Shahzad, W., & Rotimi, JOB. (2019). A process map for supply chain relationships in prefabricated construction. In X. Zhao, P. Kalutara, & R. Webber (Eds.)
43rd AUBEA Australasian Universities Building Education Association Conference. (pp. 112 - 123). : 43rd Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Shahzad, W.
Asadi, R., Wilkinson, S., & Rotimi, JOB. (2019). Contract document appraisal and rework root causes clasisification in tendering stage of projects. In X. Zhao, P. Kalutara, & R. Webber (Eds.)
43rd AUBEA Australasian Universities Building Education Association Conference. (pp. 86 - 98). : 43rd Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Davenport, R., & Rotimi, JO. (2019). Sustainable performance in the earthworks sub sector: Exploring the machinery selection framework in New Zealand. (pp. 1 - 10). : The 10th International Conference on Engineering, Project, and Production Management
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Adafin, J., Rotimi, JOB., Wilkinson, S., & Mbachu, J. (2019). An assessment of risk factors impacting budget variability in New Zealand commercial construction projects.
Association of Researchers in Construction Management, ARCOM 2019 - Proceedings of the 35th Annual Conference. (pp. 44 - 53).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

Adafin, J., Wilkinson, S., Rotimi, J., Tookey, J., Potangoroa, R., & MacGregor, C. (2019). Why transform the building industry? a case for technological change in New Zealand construction. : CIB World Building Congress 2019 (CIB WBC 2019)
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

Alqudah, H., Poshdar, M., Rotimi, J., & Oyewobi, L. (2018). Determinants of construction organisations' performance: A systematic literature review. In D. Khoa, M. Sutrisna, E. Jonescu, & A. Zaman (Eds.)
42nd AUBEA Conference 2018. (pp. 244 - 253). : 42nd AUBEA Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Adafin, J., Wilkinson, S., Rotimi, JOB., Tookey, J., Potangoroa, R., & MacGregor, C. (2018). Why transform the building industry? A case for drivers and barriers to innovation acceleration. In D. Khoa, M. Sutrisna, B. Cooper-Cooke, & OA. Olatunji (Eds.)
42nd AUBEA Conference 2018. Vol. 1 (pp. 130 - 139). : 42nd AUBEA Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Moore, D., Rotimi, J., Qadir, J., GhaffarianHoseini, A., & GhaffarianHoseini, A. (2019). Working with BIM: are we really doing it, and who is counting. (pp. 1 - 2). : When Social Science Meets Lean and BIM. 6th International Workshop.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Adafin, J., Wilkinson, S., Rotimi, JOB., Tookey, J., Potangoroa, R., & MacGregor, C. (2018). Why transform the building industry? A case for drivers and barriers to innovation acceleration. In K. Do, M. Sutrisna, B. Cooper-Cooke, & OA. Oluwole (Eds.)
42nd AUBEA Conference 2018: Educating Building Professionals for the Future in the Globalised World. Vol. 1 (pp. 130 - 139). : 42nd AUBEA Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Alqudah, H., Rotimi, J., Poshdar, M., & Oyewobi, L. (2018). Determinants of construction organisations' performance: A systematic literature review. In K. Do, M. Sutrisna, E. Jonescu, & A. Zaman (Eds.)
42nd AuBEA Confernece 2018: Educating Building Professionals for the Future in the Globalised World. Vol. 3 (pp. 244 - 253). : 42nd AUBEA Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Moore, D., Poshdar, M., Rotimi, J., Qadir, J., GhaffarianHoseini, A., & GhaffarianHoseini, A. (2018). Working with BIM: are we really doing it, and who is counting?
Monday 8 - Tuesday 9 January 2018
University of Huddersfield, Oastler Building, Queensgate, Huddersfield, HD1 3DH. , 6th International Workshop When Social Science Meets Lean and BIM
[Conference Abstract]Authored by: Rotimi, J.Read Abstract:

Adafin, J., Rotimi, JOB., Wilkinson, S., & Windapo, AO. (2017). Achieving design-stage elemental cost planning accuracy: A New Zealand study.
19th International Conference on Civil and Construction Engineering. Vol. 19 (pp. 2631 - 2636). Sydney, Australia: ICCCE 2017: 19th International Conference on Civil and Construction Engineering
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Dananajaya, O., Ramachandra, T., & Rotimi, JO. (2016). A framework to enhance productivity in construction projects involving international professionals and contractors in Sri Lanka. Toronto, Canada: RICS COBRA Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Weerasinghe, A., Ramachandra, T., & Rotimi, JOB. (2016). A simplified model for predicting running cost of office buildings in Sri Lanka. In PW. Chan, & CJ. Neilson (Eds.)
Proceedings 32nd Annual Association of Researchers in Construction Management (ARCOM) Conference. Vol. 1 (pp. 341 - 350). Manchester, UK
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB., Ramachandra, T., & Windapo, AO. (2016). An analysis of Liquidators’ reports for construction companies in New Zealand.
Annals 10th ICEC World Congress. (pp. 1001 - 1010). Rio de Janeiro, Brazil: 10th ICEC 2016 Cost Engineering, Quantity Surveying & Project Management World Congress
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Samasoni, JC., & Rotimi, JOB. (2016). Building control and regulatory balance: Perspectives of building professionals in New Zealand. In HH. Lau, FE. Tang, CK. Ng, & A. Singh (Eds.)
Integrated Solutions for Infrastructure Development. (pp. 1 - 6). Kuching, Sarawak, Malaysia: The Third Australasia and South-East Asia Structural Engineering and Construction Conference ASEA-SEC-3
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Online:

Windapo, AO., Adediran, AA., & Rotimi, JOB. (2016). Clients’ knowledge of procurement systems and its influence on construction project performance. (pp. 110 - 119). Port Elizabeth, South Africa: 5th Construction Management Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Adafin, J., Wilkinson, SJ., Rotimi, JOB., & Odeyinka, HA. (2016). Evaluating the budgetary reliability of design stage elemental cost plan in building procurement: a New Zealand study.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Balasundaram, K., Ramachandra, T., & Rotimi, JOB. (2016). Insurance policies applicable to Sri Lankan construction industry: The extent it serves its intended purpose. Toronto, Canada: RICS COBRA Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Adafin, J., Wilkinson, S., Rotimi, JOB., & Odeyinka, HA. (2016). Methodological approaches to risk assessments during cost plan production.
JIC 2016: Joint International Conference.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Rotimi, JOB., Rotimi, FE., & Bustani, SA. (2016). Review of legislative changes in disasters: New Zealand case study. In N. Domingo, & S. Wilkinson (Eds.)
Building Resilience to Address the Unexpected. (pp. 540 - 549). Auckland, New Zealand: International Conference on Building Resilience
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB., Zaeri, F., Rotimi, FE., & Owolabi, JD. (2016). The effectiveness of the Last Planner System In New Zealand construction industry: Towards an empirical justification. In K. Kahkonen, & M. Keinanen (Eds.)
Proceedings of the CIB World Building Congress 2016. Vol. 1 (pp. 528 - 539). Tampere, Finland: CIB World Building Congress 2016
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Adafin, JK., Wilkinson, S., & Rotimi, J. (2015). Accuracy in design stage elemental cost planning: an analysis of New Zealand data.
Environmental Design and Management International Conference (EDMIC) 2015.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Adafin, J., Wilkinson, S., Rotimi, JOB., & Odeyinka, H. (2014). An exploration of theoretical concepts and methods for assessing risk impacts on the variability between design stage elemental cost plan and tender sum.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Samasoni, JC., & Rotimi, JOB. (2014). An exploratory evaluation of a new national online consenting system in New Zealand. In N. Dawood, & S. Alkass (Eds.)
CONVR 2014 Proceedings of the 14th International Conference on Construction Applications of Virtual Realityand Islamic Architecture. (pp. 333 - 341). Sharjah, UAE: 14th International Conference on Construction Applications of Virtual Reality and Islamic Architecture
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Samasoni, JC., & Rotimi, JOB. (2014). An exploratory evaluation of the new risk-based inspection scheme. In K. Chantawarangul, W. Suanpaga, S. Yazdani, V. Vimonsatit, & A. Singh (Eds.)
Sustainable solution in structural engineering and construction. (pp. 501 - 506). Bangkok, Thailand.: The Second Australasia and South-East Asia Structural Engineering and Construction Conference (ASEA-SEC-2) on Sustainable Solutions in Structural Engineering and Construction
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Jayawardena, N., Ramachandra, T., & Rotimi, J. (2014). Cause and effects of variations on construction projects. In K. Chantawarangul, W. Suanpaga, S. Yazdani, V. Vimonsatit, & A. Singh (Eds.) (pp. 483 - 488). : The Second Australasia and South-East Asia Structural Engineering and Construction Conference (ASEA-SEC-2) on Sustainable Solutions in Structural Engineering and Construction
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Zaeri, F., & Rotimi, JOB. (2014). Developing activity cycled based diagram for simulating a bridge construction operation.
4th New Zealand Built Environment Research Symposium. (pp. 1 - 19). Auckland/New Zealand
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Oyewobi, LO., Windapo, AO., & Rotimi, JOB. (2014). Evaluation of the impact of organisational contingency factors on firm performance. In I. Musonda, CO. Aigbavboa, E. Mwanuaumo, M. Muya, E. Zulu, WD. Thwala, . . . JN. Agumba (Eds.)
Proceedings of the International Conference on Infrastructure Development and Investment Strategies for Africalligence. (pp. 297 - 314). Livingstone, Zambia: Decades of Infrastructure Investment Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Adafin, J., Wilkinson, S., Rotimi, JOB., & Odeyinka, H. (2014). Exploring cost and risk issues in the variability between design stage elemental cost plan and final tender sum.
4th New Zealand Built Environment Research Symposium (NZBERS).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Zaeri, F., Rotimi, JOB., & McCorquodale, C. (2014). Exploring performances and their interdependencies in bridge construction: A case study. Istanbul, Turkey: The Istanbul Bridge Conference iBridge
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Zaeri, F., & Rotimi, JOB. (2014). Simulation of bridge construction works: An exploratory study in New Zealand. In K. Chantawarangul, W. Suanpaga, S. Yazdani, V. Vimonsatit, & A. Singh (Eds.) (pp. 705 - 710). Bangkok, Thailand: The Second Australasia and South-East Asia (ASEA-SEC-2) on Sustainable solutions in structural engineering and construction
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Aliakbarlou, S., Wilkinson, S., Costello, SB., & Rotimi, JOB. (2014). Client value in procured construction services: New Zealand participants' perspectives.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Oyewobi, LO., Windapo, AO., Cattell, K., & Rotimi, JOB. (2013). A framework for identifying construction companies best practice: A panacea for corporate performance failure. In S. Kajewski, K. Manley, & K. Hampson (Eds.)
Proceedings of the 19th International CIB World Building Congress, Brisbane 2013: Construction and Society. Queensland, Australia: The CIB World Building Congress 2013: Construction and Society
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ramachandra, T., Rotimi, JOB., & Kanageswaran, R. (2013). Analysis of contractors' head office overhead on compensable delay events. In TW. Yiu, & V. Gonzales (Eds.)Auckland, New Zealand: The 38th Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rajeh, M., Tookey, J., & Rotimi, JOB. (2013). Best procurement selection: Development of a conceptual model based on transaction costs. In TW. Yiu, & V. Gonzales (Eds.)Auckland, New Zealand: The 38th Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rajeh, M., Tookey, JE., & Rotimi, JO. (2013). Determinng the magnitude of transaction costs in construction procurement systems: An exploratory study. In K. Kajewski, K. Manley, & K. Hampson (Eds.)
Proceedings of the 19th International CIB World Building Congress, Brisbane 2013: Construction and Society. Queensland, Australia: The CIB World Building Congress 2013: Construction and Society
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ramachandra, T., & Rotimi, JOB. (2013). Evaluating the effectiveness of construction payment provisions in New Zealand. New Delhi/India: 2013 RICS COBRA Research Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Oyewobi, LO., Windapo, AO., Cattell, KS., & Rotimi, JOB. (2013). Impact of organisational structure and strategies on construction organisations' performance. In TW. Yiu, & V. Gonzales (Eds.)Auckland, New Zealand: The 38th Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Adafin, J., Wilkinson, S., & Rotimi, JOB. (2013). Risk-contingency fund in the design stage elemental cost planning function: a theoretical exploration.
AUBEA 2103.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Samarasinghe, A., Tookey, J., & Rotimi, JOB. (2013). Supply chain collaboration in New Zealand house construction. In TW. Yiu, & V. Gonzales (Eds.)Auckland, New Zealand: The 38th Australasian Universities Building Education Association Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Thiruchelvam, S., Tookey, JE., Rotimi, JOB., Samarasinghe, DAS., Mustapha, KN., & Kadirgama, K. (2012). A conceptual framework to evaluate suppliers for building infrastructure in the Malaysian electricity supply industry. Kuala Lumpur, Malaysia: UTM-IBIMA International Real Estate Conference 2012 (INTEREC 2012)
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Samarasinghe, DAS., Tookey, J., Rotimi, J., & Windapo, A. (2012). Clients and their professional advisers’ role in construction materials purchasing functions.. In K. Michell, P. Bowen, & K. Cattell (Eds.)
Joint CIB W070, W092 & TG72 International Conference on Facilities Management, Procurement Systems and Public Private Partnership - Delivering Value to the Community. (pp. 196 - 201). South Africa: Joint CIB W070, W092 & TG72 International Conference on Facility Management, Procurement Systems and Public Private Partnership.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ramachandra, T., & Rotimi, JOB. (2012). Construction payment delays and losses: Perceptions of New Zealand.
Faces and Facets of Project Management. Wellington: 18th Project Management Conference 2012
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Windapo, A., & Rotimi, J. (2012). Determining project performance criteria and key procurement methods in Nigeria: Owner’s perspectives.. In K. Michell, P. Bowen, & K. Cattrell (Eds.)
Joint CIB W070, W092 & TG72 International Conference on Facilities Management, Procurement Systems and Public Private Partnership - Delivering Value to the Community. (pp. 250 - 259). South Africa.: Joint CIB W070, W092 & TG72 International Conference on Facility Management, Procurement Systems and Public Private Partnership.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB., & Kiptala, RK. (2012). Evaluating the adequacy of installed ventilation systems in high rise buildings in Nairobi, Kenya. In S. Laryea, SA. Agyepong, R. Leiringer, & W. Hughes (Eds.)Vol. 2 (pp. 1285 - 1294). Abuja, Nigeria: 4th West Africa Built Environment Research (WABER) Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB., & Londero, R. (2012). Evaluating trust and inter-organisational relationships on an industrial project. In D. Kashiwagi, & K. Sullivan (Eds.)
Proceedings of the Construction, Building and Real Estate Conference. (pp. 1724 - 1731). Las Vegas, Navada USA: RICS COBRA 2012
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Samarasinghe, DAS., Tookey, JE., Rotimi, JOB., Windapo, AO., & Thiruchelvam, S. (2012). Examining construction materials purchasing practices. In I. Kamardeen, S. Newton, B. Lim, & M. Loosemore (Eds.) (pp. 565 - 574). Sydney, Australia: 37th Annual Conference of Australasian Universities Building Education Association (AUBEA)
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ramanayaka, C., & Rotimi, JOB. (2012). Reflective practice: Scoping its applicability for sucessful construction project delivery. In D. Kashiwagi, & K. Sullivan (Eds.)
Proceedings of the Construction, Building and Real Estate Conference. (pp. 363 - 371). Las Vegas, Nevada USA: RICS COBRA 2012
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Samarasinghe, DAS., Tookey, JE., Rotimi, JOB., & Thiruchelvam, S. (2012). Securing Best Prices for Construction Materials: An Exploratory Study of the New Zealand Construction Industry. In T. Hoque (Ed.)
Proceedings of Fourth Annual American Business Research Conference. (pp. 1 - 15). New York: Fourth Annual American Business Research Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ramanayaka, C., & Rotimi, JO. (2012). Strategy-led construction: Success through a human-centred approach. In I. Kamardeen, S. Newton, B. Lim, & M. Loosemore (Eds.) (pp. 260 - 267). Sydney, Australia: 37th Annual Conference of Australasian University Building Educators Association (AUBEA)
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Samarasinghe, DAS., Tookey, JE., Rotimi, JOB., & Thiruchelvam, S. (2012). Supplier selection in the construction material purchasing function. In T. Hoque (Ed.)
Proceedings of Fourth Annual American Business Research Conference. (pp. 1 - 14). New York: Fourth Annual American Business Research Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ramachandra, T., Rotimi, JOB., & Rameezdeen, R. (2012). The relationship between construction sector and the national economy of Sri Lanka. In W. Jiayuan, D. Zhikun, Z. Liang, & Z. Jian (Eds.)
Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate (CRIOCM2012). (pp. 1 - 10). Shenzhen, China: 17th International Symposium on Advancement of Construction Management and Real Estate (CRIOCM2012)
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, FE., Tookey, J., & Rotimi, JO. (2012). The UK snagging process: A benchmark for residential construction. In V. Vimonsatit, A. Singh, & S. Yazdani (Eds.)
Research, Development, and Practice in Structural Engineering and Construction. (pp. 1015 - 1020). Perth, Western Australia: The First Australasia and South-East Asia Structural Engineering and Construction ASEA-SEC-1 Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Online:

Vilasini, N., Neitzert, T., Rotimi, J., & Windapo, A. (2012). Towards a reorganization of sub-contractor management practices in alliance contracts.. In K. Michell, P. Bowen, & K. Cattrell (Eds.)
Joint CIB W070, W092 & TG72 International Conference on Facilities Management, Procurement Systems and Public Private Partnership - Delivering Value to the Community. (pp. 187 - 195). South Africa: Joint CIB W070, W092 & TG72 International Conference on Facility Management, Procurement Systems and Public Private Partnership.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ramachandra, T., & Rotimi, JO. (2011). Legal and Contractual Conditions: Implications on contructors' solvency. In SO. Cheung, S. Yazdani, N. Ghafoori, & A. Singh (Eds.)
Modern Methods and Advances in Structural Engineering and Construction. (pp. 59 - 64). Zürich: The Sixth International Structural Engineering and Construction Conference (ISEC-6) Modern Methods and Advances in Structural Engineering and Construction
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Online:

Rotimi, FE., Tookey, J., Rotimi, JO., & Udawatta, N. (2011). Level of customer satisfaction on quality achievement in new residential buildings in New Zealand - An exploratory study. In R. Rameezdeen, S. Senaratne, & YG. Sandanayake (Eds.)
Cost Management in a World Emerging from Adversity. (pp. 297 - 305). Sri Lanka: 15th Pacific Association of Quantity Surveyors (PAQS) Congress
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB., & Wilkinson, S. (2011). Making legislation work for post disaster reconstruction.
7th APRU Research Symposium on Multi-hazards around the Pacific Rim: Physical and Human Dimensions of Natural Hazards - From Research to Practice. (pp. 82 - 83). : APRU Research Symposium on Multi-hazards around the Pacific Rim
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, FE., Tookey, J., Craig, N., & Rotimi, JOB. (2011). Opportunities for defect reporting in new residential buildings: A case for New Zealand. In C. Egbu, & ECW. Lou (Eds.)Vol. 2 (pp. 641 - 652). UK: 27th Association of Researchers in Construction Management (ARCOM) Conference
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Mouchi, G., Rotimi, JO., & Ramachandra, T. (2011). The skill sets for managing complex construction projects.
Global Conference on Business and Finance Proceedings. Vol. 6 (pp. 599 - 610). Las Vegas, Nevada: The 2011 Winter Global Conference on Business and Finance (GCBF
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ramachandra, T., & Rotimi, JO. (2010). Review of methods for mitigating payment risks in construction: The case of New Zealand. In R. Rameezdeen, S. Senaratne, & YG. Sandanayake (Eds.)
Proceedings of the International Research Conference on Sustainability in Built Environment. (pp. 198 - 207). Colombo, Sri Lanka: International Research Conference on Sustainability in Built Environment
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB., Smith, L., & Ogunsemi, DJ. (2009). Managing the risks associated with scope changes in Guaranteed Maximum Price (GMP) contracts.
Proceedings of the Fourth Built Environment Conference (ASOCSA 2009. Livingstone, Zambia: Fourth Built Environment Conference (ASOCSA 2009
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Ogunsemi, DR., Oyediran, OS., Rotimi, JOB., & Ekundayo, D. (2008). Project management service delivery using competency analysis.
Proceedings of the International Conference on Project Management (ICoPM) on Achieving Excellence through Project Management. (pp. 43 - 51). Malaysia: International Conference on Project Management (ICoPM) on Achieving Excellence through Project Management
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Zuo, K., Potangaroa, R., Wilkinson, S., & Rotimi, JOB. (2008). Supply chain analysis and the sustainability of post disaster construction.
Proceedings of the Building Abroad Conference on Procurement of Construction and Reconstruction Projects in the International Context. (pp. 471 - 485). Canada: Building Abroad Conference on Procurement of Construction and Reconstruction Projects in the International Context
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB., Wilkinson, S., Myburgh, D., & Zuo, K. (2008). The Building Act and post-disaster reconstruction: Matters arising.
Proceedings of the Building Abroad Conference on Procurement of Construction and Reconstruction Projects in the International Context. (pp. 373 - 383). Canada: Building Abroad Conference on Procurement of Construction and Reconstruction Projects in the International Context
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JO., Wilkinson, S., & Myburgh, D. (2008). Towards a national policy framework for post-disaster reconstruction in New Zealand.
Proceedings of the Information and Research for Reconstruction (i-Rec) Fourth International Conference on ‘Post-disaster reconstruction: Building resilience-achieving effective post-disaster reconstruction.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Le Masurier, J., Rotimi, JO., & Wilkinson, S. (2007). Regulatory Framework for Post-Disaster Reconstruction: Improving resilience in the process.
Proceedings of the CIB World Building Congress on Construction for Development. International Council for Research and Innovation in Building and Construction (CIB. (pp. 2954 - 2957). Cape Town, South Africa: CIB World Building Congress on Construction for Development. International Council for Research and Innovation in Building and Construction (CIB
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB. (2006). Achieving reconstruction objectives within appropriate regulatory frameworks.
Paper presented at the 31st AUBEA Conference on Building in Value. Australasian Universities Building Educators Association (AUBEA. Sydney, Australia: 31st AUBEA Conference on Building in Value. Australasian Universities Building Educators Association (AUBEA
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB.(2006).
The framework for effective post-disaster reconstruction in New Zealand.
[Conference Paper]Authored by: Rotimi, J.
Rotimi, JOB.(2006, August). The framework for effective post-disaster reconstruction in New Zealand.
.
[Conference]Authored by: Rotimi, J.
Rotimi, JOB., Le Masurier, J., & Wilkinson, S. (2006). The regulatory framework for effective post-disaster reconstruction in New Zealand.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.
Mohammed, SM., & Rotimi, JOB.A review of quality control and assurance in building construction.
Millenium Conference on Building in the 21st Century. (pp. 224 - 233). Zaria, Nigeria: Millenium Conference on Building in the 21st Century
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Rotimi, JOB., & Mttalib, MO. (1995). Economic considerations in building maintenance works. In MT. Oladiran, A. Ngowi, A. Obok-Opok, SJ. Shine, & E. Bakaya-Kyakura (Eds.)
The International Conference on Maintenance of Engineering Facilities in Developing Countries. (pp. 57 - 63). Gaborone, Botswana: International Conference on Maintenance of Engineering Facilities in Developing Countries (MEF95)
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Geekiyanage, D., Ramachandra, T., & Rotimi, JOB. (2017). A morphology-based model for forecasting cooling energy demand of condominium buildings in Sri Lanka.
Association of Researchers in Construction Management, ARCOM - 33rd Annual Conference 2017, Proceeding. (pp. 289 - 298).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Weerasinghe, A., Ramachandra, T., & Rotimi, JOB. (2016). A Simplified model for predicting running cost of office buildings in Sri Lanka.
Proceedings of the 32nd Annual ARCOM Conference, ARCOM 2016. (pp. 331 - 340).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Samasoni, J., & Rotimi, JOB. (2016). Perceptions of regulatory building inspectors and designers on the proposed risk-based inspection regime in New Zealand.
Proceedings of the 32nd Annual ARCOM Conference, ARCOM 2016. (pp. 227 - 236).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Ramachandra, T., Rotimi, JO., & Gunaratne, S. (2014). Reasons for contractors' delay claims failures in Sri Lanka.
Proceedings 30th Annual Association of Researchers in Construction Management Conference, ARCOM 2014. (pp. 475 - 484).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Ramachandra, T., Rotimi, JOB., & Rameezdeen, R. (2014). The relationship between construction sector and the national economy of Sri Lanka.
Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate. (pp. 1263 - 1271).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Online:

Read Abstract:

Adafin, J., Wilkinson, S., Rotimi, JOB., & Odeyinka, H. (2014). Accuracy in design stage cost estimating through risk-contingency analysis: A theoretical exploration.
Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. (pp. 1478 - 1487).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

Zaeri, F., & Rotimi, JOB. (2014). The power of technology in bridge construction project management.
31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. (pp. 443 - 449).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Oyewobi, LO., Windapo, AO., & Rotimi, JOB. (2013). The effects of business environments on corporate strategies and performance of construction organisations.
Proceedings 29th Annual Association of Researchers in Construction Management Conference, ARCOM 2013. (pp. 691 - 701).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Ramanayaka, C., & Rotimi, J. (2011). Strategy: Towards its applicability for successful project delivery.
Association of Researchers in Construction Management, ARCOM 2011 - Proceedings of the 27th Annual Conference. Vol. 2 (pp. 869 - 878).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Rotimi, FE., Tookey, J., Rotimi, JO., & Craig, N. (2011). Improved snag reporting in new residential buildings in New Zealand.
COBRA 2011 - Proceedings of RICS Construction and Property Conference. (pp. 1469 - 1478).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Ramachandra, T., & Rotimi, JO. (2011). Legal and contractual conditions: Implications on constructors' solvency.
ISEC 2011 - 6th International Structural Engineering and Construction Conference: Modern Methods and Advances in Structural Engineering and Construction. (pp. 59 - 64).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Online:

Read Abstract:

Rotimi, JOB., & Wilkinson, S. (2010). Scoping disaster recovery considerations in environmental legislation: A New Zealand perspective.
COBRA 2010 - Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

Ramachandra, T., & Rotimi, JOB. (2010). Construction Liquidation and payment losses: A review of New Zealand construction industry. In Y. Wang, J. Yang, & GQP. Shen (Eds.)
Proceedings of the 2010 International Conference on Construction and Real Estate Management. Vol. 1 (pp. 167 - 171). Brisbane, Australia: The 8th International Conference on Construction and Real Estate Management ICCREM2010 on leading sustainable development through construction and real estate management
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.
Awodele, OA., Ogunsemi, DR., & Rotimi, JOB. (2008). Private Participation in Infrastructure (PPI) development in developing economies - The Nigerian experience.
COBRA 2008 - Construction and Building Research Conference of the Royal Institution of Chartered Surveyors.
[Conference Paper in Published Proceedings]Authored by: Rotimi, J.Read Abstract:

Le Masurier, J., Rotimi, JOB., & Wilkinson, S. (2006). A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand.
Association of Researchers in Construction Management, ARCOM 2006 - Procs 22nd Annual ARCOM Conference. Vol. 1 (pp. 523 - 530).
[Conference Paper in Published Proceedings]Authored by: Rotimi, J., Wilkinson, S.Read Abstract:

view less...