User Tools

Site Tools


chores

Table of Contents

To Do List


PABX Room

  • Simurg Head Node
    • Install BCM 7.0 + CentOS 7.0
    • Install Proprietaries (intel, gaussian, molpro, etc.)
    • Physical Rack Install
    • Write Environment Modules
  • Infiniband Switch Setup
    • Rack Routing
    • Setup BCM Control
  • Ethernet Switch Setup
    • Rack Routing
    • Setup BMC/IPMI Control
  • Simurg NEW Compute Nodes
    • Build Image on Head
    • Verify IB/IPMI Subnets
    • Flash Out Computes
  • Simurg OLD Compute Nodes (Marvin)
    • Slowly deactivate and transfer Intels & AMDs

Website

  • Finish “construction” pages.
  • Change footer links.
  • Forms for User Registry.
  • Think about how to layout FAQ vs. HOWTOs
chores.txt · Last modified: 2014/12/17 08:19 by admin